Monmouth County Purchasing Division
F-39-2027
Click here to download the project's Specification, Clarifications, Addenda, ect.2027 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS IN THE COUNTY OF MONMOUTH FOR THE PERIOD OF JANUARY 1, 2027 THROUGH DECEMBER 31, 2027
Bids must be made on standard RFB forms in the manner designated and required by the specifications. Information on obtaining specifications may be obtained from the Monmouth County Purchasing Department
| Number | Item Description | Unit | Qty |
|---|---|---|---|
| 1 | PERFORMANCE BOND AND PAYMENT BOND | LS | 1 |
| 2 | OWNER'S AND CONTRACTOR'S PROTECTIVE LIABILITY INSURANCE | LS | 1 |
| 3 | TRAFFIC DIRECTORS | HOUR(S) | 8 |
| 4 | UNIFORMED POLICE OFFICER ALLOWANCE | DOLLARS | 10000 |
| 5 | BREAKAWAY BARRICADES | UNIT(S) | 5 |
| 6 | TRAFFIC CONES | UNIT(S) | 30 |
| 7 | DRUMS | UNIT(S) | 8 |
| 8 | CONSTRUCTION SIGNS, 48" X 48" | UNIT(S) | 4 |
| 9 | CONSTRUCTION SIGNS, 60" X 30" | UNIT(S) | 4 |
| 10 | CONSTRUCTION SIGNS, 48" X 24" | UNIT(S) | 4 |
| 11 | CONSTRUCTION SIGNS, 48" X 30" | UNIT(S) | 4 |
| 12 | FLOODLIGHTS FOR NIGHT TIME OPERATIONS | DAY(S) | 4 |
| 13 | ILLUMINATED FLASHING ARROWS, 4' X 8' | DAY(S) | 3 |
| 14 | TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE | UNIT(S) | 1 |
| 15 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS | DAY(S) | 3 |
| 16 | MOBILIZATION OF TRAFFIC CONTROL | DAY(S) | 5 |
| 17 | MATERIALS ALLOWANCE | UNIT(S) | 75000 |
| 18 | SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE | UNIT(S) | 25000 |
| 19 | MOBILIZATION OF LAND BASED PILE DRIVER - STD | HOUR(S) | 4 |
| 20 | MOBILIZATION OF LAND BASED PILE DRIVER - PREM | HOUR(S) | 2 |
| 21 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES - STD | HOUR(S) | 4 |
| 22 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES - PREM | HOUR(S) | 2 |
| 23 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED - STD | HOUR(S) | 4 |
| 24 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED - PREM | HOUR(S) | 2 |
| 25 | DIVER - STD | HOUR(S) | 8 |
| 26 | DIVER - PREM | HOUR(S) | 2 |
| 27 | PE DIVER-STD | HOUR(S) | 8 |
| 28 | PE DIVER-PREM | HOUR(S) | 4 |
| 29 | SHOP PREPARATION - STD | HOUR(S) | 16 |
| 30 | SHOP PREPARATION - PREM | HOUR(S) | 4 |
| 31 | SHOP FABRICATION - STD | HOUR(S) | 16 |
| 32 | SHOP FABRICATION - PREM | HOUR(S) | 4 |
| 33 | TIMBER WORK - STD | HOUR(S) | 180 |
| 34 | TIMBER WORK - PREM | HOUR(S) | 50 |
| 35 | CONCRETE WORK - STD | HOUR(S) | 180 |
| 36 | CONCRETE WORK - PREM | HOUR(S) | 25 |
| 37 | STEEL WORK - STD | HOUR(S) | 180 |
| 38 | STEEL WORK - PREM | HOUR(S) | 25 |
| 39 | LABORER - STD | HOUR(S) | 200 |
| 40 | LABORER - PREM | HOUR(S) | 25 |
| 41 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 50 |
| 42 | CONCRETE SIDEWALK, 4" THICK | SQ.YD(S) | 25 |
| 43 | CONCRETE DRIVEWAY, REINFORCED, 6" THICK | SQ.YD(S) | 25 |
| 44 | DETECTABLE WARNING SURFACE | SQ.YD(S) | 10 |
| 45 | REPAIR OF CONCRETE DECK, TYPE A | SQ.FT | 50 |
| 46 | REPAIR OF CONCRETE DECK, TYPE B | SQ.FT | 50 |
| 47 | REPAIR OF CONCRETE DECK, TYPE C | SQ.FT | 25 |
| 48 | TRAVEL - STD | HOUR(S) | 20 |
| 49 | TRAVEL - PREM | HOUR(S) | 4 |
| 50 | ACCESS WORK BOAT | HOUR(S) | 24 |
| 51 | MANPOWER ACCESS MACHINE, SELF PROPELLED | HOUR(S) | 8 |
| 52 | WORKING BARGE, SELF PROPELLED - STD | HOUR(S) | 8 |
| 53 | WORKING BARGE, SELF PROPELLED - PREM | HOUR(S) | 4 |
| 54 | AIR COMPRESSOR (150-225CFM) | HOUR(S) | 40 |
| 55 | FLOATING WORK PLATFORM | HOUR(S) | 24 |
| 56 | WATER BLAST CLEANING UNIT | HOUR(S) | 12 |
| 57 | PORTABLE CORE DRILL | HOUR(S) | 8 |
| 58 | JACKING SYSTEM, 100 TON | HOUR(S) | 8 |
| 59 | JACKING SYSTEM, (PAN CAKE), 100 TON | HOUR(S) | 4 |
| 60 | JACKING SYSTEM, 50 TON | HOUR(S) | 8 |
| 61 | JACKING SYSTEM, (PAN CAKE), 50 TON | HOUR(S) | 8 |
| 62 | MECHANICAL MORTAR/GROUT MIXER | HOUR(S) | 8 |
| 63 | MECHANICAL CONCRETE MIXER | HOUR(S) | 8 |
| 64 | BLAST CLEANING UNIT | HOUR(S) | 12 |
| 65 | WALK BEHIND CONCRETE SAW | HOUR(S) | 4 |
| 66 | DEWATERING | HOUR(S) | 40 |
| 67 | DELAMINATION SURVEY | HOUR(S) | 4 |
| 68 | PNEUMATICALLY APPLIED MORTAR SYSTEM | HOUR(S) | 4 |
| 69 | MUD JACKING SYSTEM | HOUR(S) | 8 |
| 70 | PICKUP TRUCK, 4 X 2, GAS POWERED, STD | HOUR(S) | 50 |
| 71 | PICKUP TRUCK, 4 X 2, GAS POWERED, PREM | HOUR(S) | 4 |
| 72 | STAKE BODY TRUCK - STD | HOUR(S) | 150 |
| 73 | STAKE BODY TRUCK - PREM | HOUR(S) | 4 |
| 74 | TRUCK MOUNTED CRANE - STD | HOUR(S) | 24 |
| 75 | TRUCK MOUNTED CRANE - PREM | HOUR(S) | 4 |
| 76 | EXCAVATOR - STD | HOUR(S) | 180 |
| 77 | EXCAVATOR - PREM | HOUR(S) | 8 |
| 78 | LOADER - STD | HOUR(S) | 50 |
| 79 | LOADER - PREM | HOUR(S) | 4 |
| 80 | TELESCOPIC FORKLIFT - STD | HOUR(S) | 8 |
| 81 | TELESCOPIC FORKLIFT - PREM | HOUR(S) | 4 |
| 82 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD | HOUR(S) | 8 |
| 83 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM | HOUR(S) | 4 |
| 84 | DUMP TRUCK, 10 CY - STD | HOUR(S) | 40 |
| 85 | DUMP TRUCK, 10 CY - PREM | HOUR(S) | 4 |
| 86 | TANDEM DUMP TRUCK, 16 CY - STD | HOUR(S) | 40 |
| 87 | TANDEM DUMP TRUCK, 16 CY - PREM | HOUR(S) | 2 |
| 88 | LAND BASED PILE DRIVER - STD | HOUR(S) | 8 |
| 89 | LAND BASED PILE DRIVER - PREM | HOUR(S) | 2 |
| 90 | BARGE BASED PILE DRIVER, 60 FOOT PILES, STD | HOUR(S) | 8 |
| 91 | BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 2 |
| 92 | COMBINATION LOADER/BACKHOE, STD | HOUR(S) | 40 |
| 93 | COMBINATION LOADER/BACKHOE, PREM | HOUR(S) | 2 |
| 94 | CONCRETE PUMP, STD | HOUR(S) | 8 |
| 95 | CONCRETE PUMP, PREM | HOUR(S) | 2 |
| 96 | SNOOPER, ON-CALL DAILY | DAY(S) | 1 |
| 97 | SNOOPER, ON-CALL WEEKLY | WEEK(S) | 1 |
| 98 | MAINTENANCE AND PROTECTION OF TRAFFIC, BRIDGE W-27 | LS | 1 |
| 99 | CONSTRUCTION SIGNS | SQ.FT | 67 |
| 100 | CONTROLLED FIELD SURVEY | LS | 1 |
| 101 | AS-BUILT FIELD SURVEY | LS | 1 |
| 102 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 403 |
| 103 | I-9 SOIL AGGREGATE | CU.YD(S) | 125 |
| 104 | I-14 SOIL AGGREGATE | CU.YD(S) | 29 |
| 105 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 121 |
| 106 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 528 |
| 107 | TACK COAT | GAL(S) | 100 |
| 108 | HOT MIX ASPHALT 9.5M64 SURFACE COURSE | TON(S) | 80 |
| 109 | HOT MIX ASPHALT 19M64 BASE COURSE | TON(S) | 46 |
| 110 | CONCRETE SIDEWALK, 4" THICK | SQ.YD(S) | 353 |
| 111 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 260 |
| 112 | TRAFFIC STRIPES, 4" (IF & WHERE DIRECTED) | LN.FT | 618 |
| 113 | TOPSOIL SPREADING, 6" THICK (IF & WHERE DIRECTED) | SQ.YD(S) | 27 |
| 114 | BORROW TOPSOIL (IF & WHERE DIRECTED) | CU.YD(S) | 13 |
| 115 | FERTILIZING AND SEEDING, TYPE 13 (IF & WHERE DIRECTED) | SQ.YD(S) | 27 |
| 116 | STRAW MULCHING (IF & WHERE DIRECTED) | SQ.YD(S) | 27 |
| 117 | VIBRATION MONITORING | LS | 1 |
| 118 | CLEARING SITE, BRIDGE W-27 | LS | 1 |
| 119 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 39100 |
| 120 | DRILL AND GROUT REINFORCEMENT STEEL | EACH | 185 |
| 121 | CLEANING & COATING OF CONCRETE SURFACE | SQ.FT | 9176 |
| 122 | CONCRETE WINGWALL | CU.YD(S) | 22 |
| 123 | CONCRETE PYLON | LN.FT | 23 |
| 124 | CONCRETE SPANDREL WALL | CU.YD(S) | 17 |
| 125 | CONCRETE MOMENT SLAB | CU.YD(S) | 99 |
| 126 | CONCRETE BRIDGE PARAPET | LN.FT | 237 |
| 127 | SUBSTRUCTURE CONCRETE REPAIR | SQ.FT | 68 |
| 128 | GAS MAIN RELOCATION WORK | LS | 1 |
| 129 | MAINTENACE AND PROTECTION OF TRAFFIC | LS | 1 |
| 130 | 16' X 8' MANUFACTURED TREATMENT DEVICE | UNIT(S) | 1 |
| 131 | 10' X 6' MANUFACTURED TREATMENT DEVICE | UNIT(S) | 1 |
| 132 | 7.83' X 4.5' MANUFACTURED TREATMENT DEVICE | UNIT(S) | 1 |
| 133 | CONCRETE SIDEWALK, 4" THICK | SQ.YD(S) | 42 |
| 134 | CONCRETE VERTICAL CURB & GUTTER | LN.FT | 104 |
| 135 | DETECTABLE WARNING SURFACE | SQ.YD(S) | 1 |
| 136 | TOPSOIL SPREADING, 6" THICK | SQ.YD(S) | 30 |
| 137 | FERTILIZING AND SEEDING, TYPE 13 | SQ.YD(S) | 30 |
| 138 | STRAW MULCHING | SQ.YD(S) | 30 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: SOPHIA GIEZEY 732-431-7370 X7381
Delivery Date: 1/1/2027 - 12/31/2027