Monmouth County Purchasing Division
F-107-2025
2025/2026 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS, IN THE COUNTY OF MONMOUTH FOR THE ESTIMATED TIME PERIOD OF OCTOBER 1, 2025 THROUGH JULY 31, 2026
| Number | Item Description | Unit | Qty | Unit Price | Total |
|---|---|---|---|---|---|
|
SPARWICK CONTRACTING INC.
(Total Awarded: $1,799,944.48)
973-300-4709 |
|||||
| TIME AND MATERIAL | |||||
| 1 | PERFORMANCE BOND AND PAYMENT BOND | LS | 1 | $0.01 | $0.01 |
| 2 | OWNER'S AND CONTRACTOR'S PROTECTIVE LIABILITY INSURANCE | LS | 1 | $0.01 | $0.01 |
| 3 | TRAFFIC DIRECTORS | HOUR(S) | 8 | $0.01 | $0.08 |
| 4 | UNIFORMED POLICE OFFICER ALLOWANCE | DOLLARS | 10000 | $1.00 | $10,000.00 |
| 5 | BREAKAWAY BARRICADES | UNIT(S) | 5 | $0.01 | $0.05 |
| 6 | TRAFFIC CONES | UNIT(S) | 15 | $0.01 | $0.15 |
| 7 | DRUMS | UNIT(S) | 8 | $0.01 | $0.08 |
| 8 | CONSTRUCTION SIGNS, 48" X 48" | UNIT(S) | 4 | $0.01 | $0.04 |
| 9 | CONSTRUCTION SIGNS, 60" X 30" | UNIT(S) | 4 | $0.01 | $0.04 |
| 10 | CONSTRUCTION SIGNS, 48" X 24" | UNIT(S) | 4 | $0.01 | $0.04 |
| 11 | CONSTRUCTION SIGNS, 48" X 30" | UNIT(S) | 4 | $0.01 | $0.04 |
| 12 | FLOODLIGHTS FOR NIGHT TIME OPERATIONS | DAY(S) | 2 | $0.01 | $0.02 |
| 13 | ILLUMINATED FLASHING ARROWS, 4' X 8' | DAY(S) | 2 | $0.01 | $0.02 |
| 14 | TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE | UNIT(S) | 1 | $0.01 | $0.01 |
| 15 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS | DAY(S) | 2 | $0.01 | $0.02 |
| 16 | MOBILIZATION OF TRAFFIC CONTROL | DAY(S) | 2 | $0.01 | $0.02 |
| 17 | MATERIALS ALLOWANCE | DOLLARS | 75000 | $1.00 | $75,000.00 |
| 18 | SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE | DOLLARS | 25000 | $1.00 | $25,000.00 |
| 19 | MOBILIZATION OF LAND BASED PILE DRIVER - STD | HOUR(S) | 4 | $100.00 | $400.00 |
| 20 | MOBILIZATION OF LAND BASED PILE DRIVER - PREM | HOUR(S) | 2 | $100.00 | $200.00 |
| 21 |
MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES - STD |
HOUR(S) | 4 | $140.00 | $560.00 |
| 22 |
MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES - PREM |
HOUR(S) | 2 | $140.00 | $280.00 |
| 23 |
MOBILIZATION OF WORKING BARGE, SELF-PROPELLED - STD |
HOUR(S) | 4 | $0.01 | $0.04 |
| 24 |
MOBILIZATION OF WORKING BARGE, SELF-PROPELLED - PREM |
HOUR(S) | 2 | $0.01 | $0.02 |
| 25 | DIVER - STD | HOUR(S) | 8 | $810.00 | $6,480.00 |
| 26 | DIVER - PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 27 | PE DIVER-STD | HOUR(S) | 8 | $835.00 | $6,680.00 |
| 28 | PE DIVER-PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 29 | SHOP PREPARATION - STD | HOUR(S) | 8 | $0.01 | $0.08 |
| 30 | SHOP PREPARATION - PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 31 | SHOP FABRICATION - STD | HOUR(S) | 8 | $0.01 | $0.08 |
| 32 | SHOP FABRICATION - PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 33 | TIMBER WORK - STD | HOUR(S) | 250 | $155.00 | $38,750.00 |
| 34 | TIMBER WORK - PREM | HOUR(S) | 20 | $50.00 | $1,000.00 |
| 35 | CONCRETE WORK - STD | HOUR(S) | 250 | $155.00 | $38,750.00 |
| 36 | CONCRETE WORK - PREM | HOUR(S) | 20 | $50.00 | $1,000.00 |
| 37 | STEEL WORK - STD | HOUR(S) | 250 | $155.00 | $38,750.00 |
| 38 | STEEL WORK - PREM | HOUR(S) | 20 | $50.00 | $1,000.00 |
| 39 | LABORER - STD | HOUR(S) | 350 | $155.00 | $54,250.00 |
| 40 | LABORER - PREM | HOUR(S) | 20 | $50.00 | $1,000.00 |
| 41 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 25 | $25.00 | $625.00 |
| 42 | CONCRETE SIDEWALK, 4" THICK | SQ.YD(S) | 25 | $45.00 | $1,125.00 |
| 43 | CONCRETE DRIVEWAY, REINFORCED, 6" THICK | SQ.YD(S) | 25 | $55.00 | $1,375.00 |
| 44 | DETECTABLE WARNING SURFACE | SQ.YD(S) | 10 | $150.00 | $1,500.00 |
| 45 | REPAIR OF CONCRETE DECK, TYPE A | SQ.FT | 25 | $0.01 | $0.25 |
| 46 | REPAIR OF CONCRETE DECK, TYPE B | SQ.FT | 25 | $0.01 | $0.25 |
| 47 | REPAIR OF CONCRETE DECK, TYPE C | SQ.FT | 10 | $0.01 | $0.10 |
| 48 | TRAVEL - STD | HOUR(S) | 10 | $0.01 | $0.10 |
| 49 | TRAVEL - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 50 | ACCESS WORK BOAT | HOUR(S) | 16 | $100.00 | $1,600.00 |
| 51 | MANPOWER ACCESS MACHINE, SELF PROPELLED | HOUR(S) | 8 | $0.01 | $0.08 |
| 52 | WORKING BARGE, SELF PROPELLED - STD | HOUR(S) | 8 | $0.01 | $0.08 |
| 53 | WORKING BARGE, SELF PROPELLED - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 54 | AIR COMPRESSOR (150-225CFM) | HOUR(S) | 40 | $100.00 | $4,000.00 |
| 55 | FLOATING WORK PLATFORM | HOUR(S) | 32 | $100.00 | $3,200.00 |
| 56 | WATER BLAST CLEANING UNIT | HOUR(S) | 12 | $100.00 | $1,200.00 |
| 57 | PORTABLE CORE DRILL | HOUR(S) | 8 | $0.01 | $0.08 |
| 58 | JACKING SYSTEM, 100 TON | HOUR(S) | 8 | $0.01 | $0.08 |
| 59 | JACKING SYSTEM, (PAN CAKE), 100 TON | HOUR(S) | 4 | $0.01 | $0.04 |
| 60 | JACKING SYSTEM, 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
| 61 | JACKING SYSTEM, (PAN CAKE), 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
| 62 | MECHANICAL MORTAR/GROUT MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
| 63 | MECHANICAL CONCRETE MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
| 64 | BLAST CLEANING UNIT | HOUR(S) | 12 | $50.00 | $600.00 |
| 65 | WALK BEHIND CONCRETE SAW | HOUR(S) | 8 | $50.00 | $400.00 |
| 66 | DEWATERING | HOUR(S) | 40 | $0.01 | $0.40 |
| 67 | DELAMINATION SURVEY | HOUR(S) | 4 | $0.01 | $0.04 |
| 68 | PNEUMATICALLY APPLIED MORTAR SYSTEM | HOUR(S) | 4 | $0.01 | $0.04 |
| 69 | MUD JACKING SYSTEM | HOUR(S) | 8 | $0.01 | $0.08 |
| 70 | PICKUP TRUCK, 4 X 2, GAS POWERED, STD | HOUR(S) | 50 | $100.00 | $5,000.00 |
| 71 | PICKUP TRUCK, 4 X 2, GAS POWERED, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 72 | STAKE BODY TRUCK - STD | HOUR(S) | 50 | $100.00 | $5,000.00 |
| 73 | STAKE BODY TRUCK - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 74 | TRUCK MOUNTED CRANE - STD | HOUR(S) | 24 | $500.00 | $12,000.00 |
| 75 | TRUCK MOUNTED CRANE - PREM | HOUR(S) | 4 | $500.00 | $2,000.00 |
| 76 | EXCAVATOR - STD | HOUR(S) | 150 | $200.00 | $30,000.00 |
| 77 | EXCAVATOR - PREM | HOUR(S) | 8 | $150.00 | $1,200.00 |
| 78 | LOADER - STD | HOUR(S) | 50 | $150.00 | $7,500.00 |
| 79 | LOADER - PREM | HOUR(S) | 4 | $150.00 | $600.00 |
| 80 | TELESCOPIC FORKLIFT - STD | HOUR(S) | 8 | $0.01 | $0.08 |
| 81 | TELESCOPIC FORKLIFT - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 82 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD | HOUR(S) | 8 | $50.00 | $400.00 |
| 83 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
| 84 | DUMP TRUCK, 10 CY - STD | HOUR(S) | 50 | $100.00 | $5,000.00 |
| 85 | DUMP TRUCK, 10 CY - PREM | HOUR(S) | 4 | $100.00 | $400.00 |
| 86 | TANDEM DUMP TRUCK, 16 CY - STD | HOUR(S) | 40 | $100.00 | $4,000.00 |
| 87 | TANDEM DUMP TRUCK, 16 CY - PREM | HOUR(S) | 2 | $100.00 | $200.00 |
| 88 | LAND BASED PILE DRIVER - STD | HOUR(S) | 8 | $500.00 | $4,000.00 |
| 89 | LAND BASED PILE DRIVER - PREM | HOUR(S) | 2 | $500.00 | $1,000.00 |
| 90 | BARGE BASED PILE DRIVER, 60 FOOT PILES, STD | HOUR(S) | 8 | $500.00 | $4,000.00 |
| 91 | BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 2 | $500.00 | $1,000.00 |
| 92 | COMBINATION LOADER/BACKHOE, STD | HOUR(S) | 40 | $0.01 | $0.40 |
| 93 | COMBINATION LOADER/BACKHOE, PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 94 | CONCRETE PUMP, STD | HOUR(S) | 8 | $125.00 | $1,000.00 |
| 95 | CONCRETE PUMP, PREM | HOUR(S) | 2 | $0.01 | $0.02 |
| 96 | SNOOPER, ON-CALL DAILY | DAY(S) | 1 | $5,500.00 | $5,500.00 |
| 97 | SNOOPER, ON-CALL WEEKLY | WEEK(S) | 1 | $0.01 | $0.01 |
| SITE 1: BRIDGE A-9 | |||||
| 98 | MAINTENANCE AND PROTECTION OF TRAFFIC, BRIDGE A-9 | LS | 1 | $41,000.00 | $41,000.00 |
| 99 | CLEARING SITE, BRIDGE A-9 | LS | 1 | $41,000.00 | $41,000.00 |
| 100 | TEMPORARY COFFERDAM | LS | 1 | $40,000.00 | $40,000.00 |
| 101 | TIMBER PILE, 14" DIAMETER - FURNISHED | LN.FT | 36 | $35.00 | $1,260.00 |
| 102 | TIMBER PILE, 14" DIAMETER - INSTALLED | LN.FT | 14 | $325.00 | $4,550.00 |
| 103 | TIMBER HORIZONTAL REPAIRS, 4"X8"X12' - FURNISHED | SQ.FT | 1368 | $11.00 | $15,048.00 |
| 104 | TIMBER HORIZONTAL REPAIRS, 4"X8"X12' - INSTALLED | SQ.FT | 992 | $14.00 | $13,888.00 |
| 105 | TEMPORARY SHORING, BRIDGE A-9 | LS | 1 | $41,000.00 | $41,000.00 |
| 106 | TIMBER WALE, 6"X8" - FURNISHED | LN.FT | 24 | $32.00 | $768.00 |
| 107 | TIMBER WALE, 6"X8" - INSTALLED | LN.FT | 12 | $250.00 | $3,000.00 |
| 108 | TIMBER PILE CAP, 12"X12" - FURNISHED | LN.FT | 60 | $50.00 | $3,000.00 |
| 109 | TIMBER PILE CAP, 12"X12" - INSTALLED | LN.FT | 26 | $450.00 | $11,700.00 |
| 110 | 18" DIAMETER TIMBER PILE JACKET AND GROUT - FURNISHED | LN.FT | 290 | $100.00 | $29,000.00 |
| 111 | 18" DIAMETER TIMBER PILE JACKET AND GROUT - INSTALLED | LN.FT | 211 | $200.00 | $42,200.00 |
| 112 | RIPRAP STONE SLOPE PROTECTION (D50=12") | CU.YD(S) | 3 | $245.00 | $735.00 |
| 113 | RIPRAP STONE CHANNEL PROTECTION, 24" THICK (D50=12"), BRIDGE A-9 | CU.YD(S) | 49 | $225.00 | $11,025.00 |
| SITE 2: BRIDGE W-27 | |||||
| 114 | MAINTENACE AND PROTECTION OF TRAFFIC, BRIDGE W-27 | LS | 1 | $25,000.00 | $25,000.00 |
| 115 | CONTROLLED FIELD SURVEY | LS | 1 | $3,500.00 | $3,500.00 |
| 116 | AS-BUILT FIELD SURVEY | LS | 1 | $3,500.00 | $3,500.00 |
| 117 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 839 | $70.00 | $58,730.00 |
| 118 | I-9 SOIL AGGREGATE | CU.YD(S) | 295 | $50.00 | $14,750.00 |
| 119 | I-14 SOIL AGGREGATE | CU.YD(S) | 433 | $50.00 | $21,650.00 |
| 120 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 318 | $14.00 | $4,452.00 |
| 121 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 984 | $9.00 | $8,856.00 |
| 122 | TACK COAT | GAL(S) | 198 | $5.00 | $990.00 |
| 123 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 158 | $185.00 | $29,230.00 |
| 124 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 115 | $190.00 | $21,850.00 |
| 125 | CONCRETE SIDEWALK, 4" THICK, BRIDGE W-27 | SQ.YD(S) | 296 | $90.00 | $26,640.00 |
| 126 | 6"X8"X20" CONCRETE VERTICAL CURB, BRIDGE W-27 | LN.FT | 259 | $45.00 | $11,655.00 |
| 127 | TRAFFIC STRIPES, 4" | LN.FT | 620 | $3.00 | $1,860.00 |
| 128 | TOPSOIL SPREADING, 6" THICK | SQ.YD(S) | 32 | $12.00 | $384.00 |
| 129 | BORROW TOPSOIL | CU.YD(S) | 16 | $43.00 | $688.00 |
| 130 | FERTILIZING AND SEEDING, TYPE 13 | SQ.YD(S) | 32 | $1.00 | $32.00 |
| 131 | STRAW MULCHING | SQ.YD(S) | 32 | $1.00 | $32.00 |
| 132 | CLEARING SITE, BRIDGE W-27 | LS | 1 | $253,000.00 | $253,000.00 |
| 133 | TEMPORARY SHORING, W-27 | LS | 1 | $90,000.00 | $90,000.00 |
| 134 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 44500 | $2.25 | $100,125.00 |
| 135 | DRILL AND GROUT REINFORCEMENT STEEL | EACH | 266 | $18.00 | $4,788.00 |
| 136 | CLEANING AND COATING OF CONCRETE SURFACE | SQ.FT | 3280 | $3.00 | $9,840.00 |
| 137 | CONCRETE WINGWALL | CU.YD(S) | 19 | $3,000.00 | $57,000.00 |
| 138 | CONCRETE PYLON | LN.FT | 23 | $1,000.00 | $23,000.00 |
| 139 | CONCRETE SPANDREL WALL AND FOOTING | CU.YD(S) | 47 | $1,400.00 | $65,800.00 |
| 140 | CONCRETE MOMENT SLAB | CU.YD(S) | 86 | $250.00 | $21,500.00 |
| 141 | CONCRETE BRIDGE PARAPET | LN.FT | 236 | $910.00 | $214,760.00 |
| 142 | PRESSURE INJECTION, CONCRETE CRACKS | LN.FT | 158 | $35.00 | $5,530.00 |
| 143 | RIPRAP STONE CHANNEL PROTECTION, 24" THICK (D50=12"), BRIDGE W-27 | SQ.YD(S) | 26 | $350.00 | $9,100.00 |
| 144 | ARCH CONCRETE REPAIR | SQ.FT | 3 | $2,400.00 | $7,200.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760
Delivery Date: 10/1/2025 - 7/31/2026