F-107-2025


2025/2026 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS, IN THE COUNTY OF MONMOUTH FOR THE ESTIMATED TIME PERIOD OF OCTOBER 1, 2025 THROUGH JULY 31, 2026

Awarded: 9/25/2025
Number Item Description Unit Qty Unit Price Total
SPARWICK CONTRACTING INC. (Total Awarded: $1,799,944.48)
973-300-4709
TIME AND MATERIAL
1 PERFORMANCE BOND AND PAYMENT BOND LS 1 $0.01 $0.01
2 OWNER'S AND CONTRACTOR'S PROTECTIVE LIABILITY INSURANCE LS 1 $0.01 $0.01
3 TRAFFIC DIRECTORS HOUR(S) 8 $0.01 $0.08
4 UNIFORMED POLICE OFFICER ALLOWANCE DOLLARS 10000 $1.00 $10,000.00
5 BREAKAWAY BARRICADES UNIT(S) 5 $0.01 $0.05
6 TRAFFIC CONES UNIT(S) 15 $0.01 $0.15
7 DRUMS UNIT(S) 8 $0.01 $0.08
8 CONSTRUCTION SIGNS, 48" X 48" UNIT(S) 4 $0.01 $0.04
9 CONSTRUCTION SIGNS, 60" X 30" UNIT(S) 4 $0.01 $0.04
10 CONSTRUCTION SIGNS, 48" X 24" UNIT(S) 4 $0.01 $0.04
11 CONSTRUCTION SIGNS, 48" X 30" UNIT(S) 4 $0.01 $0.04
12 FLOODLIGHTS FOR NIGHT TIME OPERATIONS DAY(S) 2 $0.01 $0.02
13 ILLUMINATED FLASHING ARROWS, 4' X 8' DAY(S) 2 $0.01 $0.02
14 TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE UNIT(S) 1 $0.01 $0.01
15 TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS DAY(S) 2 $0.01 $0.02
16 MOBILIZATION OF TRAFFIC CONTROL DAY(S) 2 $0.01 $0.02
17 MATERIALS ALLOWANCE DOLLARS 75000 $1.00 $75,000.00
18 SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE DOLLARS 25000 $1.00 $25,000.00
19 MOBILIZATION OF LAND BASED PILE DRIVER - STD HOUR(S) 4 $100.00 $400.00
20 MOBILIZATION OF LAND BASED PILE DRIVER - PREM HOUR(S) 2 $100.00 $200.00
21 MOBILIZATION OF BARGE BASED PILE DRIVER,
60 FOOT PILES - STD
HOUR(S) 4 $140.00 $560.00
22 MOBILIZATION OF BARGE BASED PILE DRIVER,
60 FOOT PILES - PREM
HOUR(S) 2 $140.00 $280.00
23 MOBILIZATION OF WORKING BARGE,
SELF-PROPELLED - STD
HOUR(S) 4 $0.01 $0.04
24 MOBILIZATION OF WORKING BARGE,
SELF-PROPELLED - PREM
HOUR(S) 2 $0.01 $0.02
25 DIVER - STD HOUR(S) 8 $810.00 $6,480.00
26 DIVER - PREM HOUR(S) 2 $0.01 $0.02
27 PE DIVER-STD HOUR(S) 8 $835.00 $6,680.00
28 PE DIVER-PREM HOUR(S) 2 $0.01 $0.02
29 SHOP PREPARATION - STD HOUR(S) 8 $0.01 $0.08
30 SHOP PREPARATION - PREM HOUR(S) 2 $0.01 $0.02
31 SHOP FABRICATION - STD HOUR(S) 8 $0.01 $0.08
32 SHOP FABRICATION - PREM HOUR(S) 2 $0.01 $0.02
33 TIMBER WORK - STD HOUR(S) 250 $155.00 $38,750.00
34 TIMBER WORK - PREM HOUR(S) 20 $50.00 $1,000.00
35 CONCRETE WORK - STD HOUR(S) 250 $155.00 $38,750.00
36 CONCRETE WORK - PREM HOUR(S) 20 $50.00 $1,000.00
37 STEEL WORK - STD HOUR(S) 250 $155.00 $38,750.00
38 STEEL WORK - PREM HOUR(S) 20 $50.00 $1,000.00
39 LABORER - STD HOUR(S) 350 $155.00 $54,250.00
40 LABORER - PREM HOUR(S) 20 $50.00 $1,000.00
41 6" X 8" X 20" CONCRETE VERTICAL CURB LN.FT 25 $25.00 $625.00
42 CONCRETE SIDEWALK, 4" THICK SQ.YD(S) 25 $45.00 $1,125.00
43 CONCRETE DRIVEWAY, REINFORCED, 6" THICK SQ.YD(S) 25 $55.00 $1,375.00
44 DETECTABLE WARNING SURFACE SQ.YD(S) 10 $150.00 $1,500.00
45 REPAIR OF CONCRETE DECK, TYPE A SQ.FT 25 $0.01 $0.25
46 REPAIR OF CONCRETE DECK, TYPE B SQ.FT 25 $0.01 $0.25
47 REPAIR OF CONCRETE DECK, TYPE C SQ.FT 10 $0.01 $0.10
48 TRAVEL - STD HOUR(S) 10 $0.01 $0.10
49 TRAVEL - PREM HOUR(S) 4 $0.01 $0.04
50 ACCESS WORK BOAT HOUR(S) 16 $100.00 $1,600.00
51 MANPOWER ACCESS MACHINE, SELF PROPELLED HOUR(S) 8 $0.01 $0.08
52 WORKING BARGE, SELF PROPELLED - STD HOUR(S) 8 $0.01 $0.08
53 WORKING BARGE, SELF PROPELLED - PREM HOUR(S) 4 $0.01 $0.04
54 AIR COMPRESSOR (150-225CFM) HOUR(S) 40 $100.00 $4,000.00
55 FLOATING WORK PLATFORM HOUR(S) 32 $100.00 $3,200.00
56 WATER BLAST CLEANING UNIT HOUR(S) 12 $100.00 $1,200.00
57 PORTABLE CORE DRILL HOUR(S) 8 $0.01 $0.08
58 JACKING SYSTEM, 100 TON HOUR(S) 8 $0.01 $0.08
59 JACKING SYSTEM, (PAN CAKE), 100 TON HOUR(S) 4 $0.01 $0.04
60 JACKING SYSTEM, 50 TON HOUR(S) 8 $0.01 $0.08
61 JACKING SYSTEM, (PAN CAKE), 50 TON HOUR(S) 8 $0.01 $0.08
62 MECHANICAL MORTAR/GROUT MIXER HOUR(S) 8 $50.00 $400.00
63 MECHANICAL CONCRETE MIXER HOUR(S) 8 $50.00 $400.00
64 BLAST CLEANING UNIT HOUR(S) 12 $50.00 $600.00
65 WALK BEHIND CONCRETE SAW HOUR(S) 8 $50.00 $400.00
66 DEWATERING HOUR(S) 40 $0.01 $0.40
67 DELAMINATION SURVEY HOUR(S) 4 $0.01 $0.04
68 PNEUMATICALLY APPLIED MORTAR SYSTEM HOUR(S) 4 $0.01 $0.04
69 MUD JACKING SYSTEM HOUR(S) 8 $0.01 $0.08
70 PICKUP TRUCK, 4 X 2, GAS POWERED, STD HOUR(S) 50 $100.00 $5,000.00
71 PICKUP TRUCK, 4 X 2, GAS POWERED, PREM HOUR(S) 4 $0.01 $0.04
72 STAKE BODY TRUCK - STD HOUR(S) 50 $100.00 $5,000.00
73 STAKE BODY TRUCK - PREM HOUR(S) 4 $0.01 $0.04
74 TRUCK MOUNTED CRANE - STD HOUR(S) 24 $500.00 $12,000.00
75 TRUCK MOUNTED CRANE - PREM HOUR(S) 4 $500.00 $2,000.00
76 EXCAVATOR - STD HOUR(S) 150 $200.00 $30,000.00
77 EXCAVATOR - PREM HOUR(S) 8 $150.00 $1,200.00
78 LOADER - STD HOUR(S) 50 $150.00 $7,500.00
79 LOADER - PREM HOUR(S) 4 $150.00 $600.00
80 TELESCOPIC FORKLIFT - STD HOUR(S) 8 $0.01 $0.08
81 TELESCOPIC FORKLIFT - PREM HOUR(S) 4 $0.01 $0.04
82 MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD HOUR(S) 8 $50.00 $400.00
83 MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM HOUR(S) 4 $0.01 $0.04
84 DUMP TRUCK, 10 CY - STD HOUR(S) 50 $100.00 $5,000.00
85 DUMP TRUCK, 10 CY - PREM HOUR(S) 4 $100.00 $400.00
86 TANDEM DUMP TRUCK, 16 CY - STD HOUR(S) 40 $100.00 $4,000.00
87 TANDEM DUMP TRUCK, 16 CY - PREM HOUR(S) 2 $100.00 $200.00
88 LAND BASED PILE DRIVER - STD HOUR(S) 8 $500.00 $4,000.00
89 LAND BASED PILE DRIVER - PREM HOUR(S) 2 $500.00 $1,000.00
90 BARGE BASED PILE DRIVER, 60 FOOT PILES, STD HOUR(S) 8 $500.00 $4,000.00
91 BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM HOUR(S) 2 $500.00 $1,000.00
92 COMBINATION LOADER/BACKHOE, STD HOUR(S) 40 $0.01 $0.40
93 COMBINATION LOADER/BACKHOE, PREM HOUR(S) 2 $0.01 $0.02
94 CONCRETE PUMP, STD HOUR(S) 8 $125.00 $1,000.00
95 CONCRETE PUMP, PREM HOUR(S) 2 $0.01 $0.02
96 SNOOPER, ON-CALL DAILY DAY(S) 1 $5,500.00 $5,500.00
97 SNOOPER, ON-CALL WEEKLY WEEK(S) 1 $0.01 $0.01
SITE 1: BRIDGE A-9
98 MAINTENANCE AND PROTECTION OF TRAFFIC, BRIDGE A-9 LS 1 $41,000.00 $41,000.00
99 CLEARING SITE, BRIDGE A-9 LS 1 $41,000.00 $41,000.00
100 TEMPORARY COFFERDAM LS 1 $40,000.00 $40,000.00
101 TIMBER PILE, 14" DIAMETER - FURNISHED LN.FT 36 $35.00 $1,260.00
102 TIMBER PILE, 14" DIAMETER - INSTALLED LN.FT 14 $325.00 $4,550.00
103 TIMBER HORIZONTAL REPAIRS, 4"X8"X12' - FURNISHED SQ.FT 1368 $11.00 $15,048.00
104 TIMBER HORIZONTAL REPAIRS, 4"X8"X12' - INSTALLED SQ.FT 992 $14.00 $13,888.00
105 TEMPORARY SHORING, BRIDGE A-9 LS 1 $41,000.00 $41,000.00
106 TIMBER WALE, 6"X8" - FURNISHED LN.FT 24 $32.00 $768.00
107 TIMBER WALE, 6"X8" - INSTALLED LN.FT 12 $250.00 $3,000.00
108 TIMBER PILE CAP, 12"X12" - FURNISHED LN.FT 60 $50.00 $3,000.00
109 TIMBER PILE CAP, 12"X12" - INSTALLED LN.FT 26 $450.00 $11,700.00
110 18" DIAMETER TIMBER PILE JACKET AND GROUT - FURNISHED LN.FT 290 $100.00 $29,000.00
111 18" DIAMETER TIMBER PILE JACKET AND GROUT - INSTALLED LN.FT 211 $200.00 $42,200.00
112 RIPRAP STONE SLOPE PROTECTION (D50=12") CU.YD(S) 3 $245.00 $735.00
113 RIPRAP STONE CHANNEL PROTECTION, 24" THICK (D50=12"), BRIDGE A-9 CU.YD(S) 49 $225.00 $11,025.00
SITE 2: BRIDGE W-27
114 MAINTENACE AND PROTECTION OF TRAFFIC, BRIDGE W-27 LS 1 $25,000.00 $25,000.00
115 CONTROLLED FIELD SURVEY LS 1 $3,500.00 $3,500.00
116 AS-BUILT FIELD SURVEY LS 1 $3,500.00 $3,500.00
117 EXCAVATION, UNCLASSIFIED CU.YD(S) 839 $70.00 $58,730.00
118 I-9 SOIL AGGREGATE CU.YD(S) 295 $50.00 $14,750.00
119 I-14 SOIL AGGREGATE CU.YD(S) 433 $50.00 $21,650.00
120 DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK SQ.YD(S) 318 $14.00 $4,452.00
121 HMA MILLING, 3" OR LESS SQ.YD(S) 984 $9.00 $8,856.00
122 TACK COAT GAL(S) 198 $5.00 $990.00
123 HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE TON(S) 158 $185.00 $29,230.00
124 HOT MIX ASPHALT 19 M 64 BASE COURSE TON(S) 115 $190.00 $21,850.00
125 CONCRETE SIDEWALK, 4" THICK, BRIDGE W-27 SQ.YD(S) 296 $90.00 $26,640.00
126 6"X8"X20" CONCRETE VERTICAL CURB, BRIDGE W-27 LN.FT 259 $45.00 $11,655.00
127 TRAFFIC STRIPES, 4" LN.FT 620 $3.00 $1,860.00
128 TOPSOIL SPREADING, 6" THICK SQ.YD(S) 32 $12.00 $384.00
129 BORROW TOPSOIL CU.YD(S) 16 $43.00 $688.00
130 FERTILIZING AND SEEDING, TYPE 13 SQ.YD(S) 32 $1.00 $32.00
131 STRAW MULCHING SQ.YD(S) 32 $1.00 $32.00
132 CLEARING SITE, BRIDGE W-27 LS 1 $253,000.00 $253,000.00
133 TEMPORARY SHORING, W-27 LS 1 $90,000.00 $90,000.00
134 REINFORCEMENT STEEL, GALVANIZED LB(S) 44500 $2.25 $100,125.00
135 DRILL AND GROUT REINFORCEMENT STEEL EACH 266 $18.00 $4,788.00
136 CLEANING AND COATING OF CONCRETE SURFACE SQ.FT 3280 $3.00 $9,840.00
137 CONCRETE WINGWALL CU.YD(S) 19 $3,000.00 $57,000.00
138 CONCRETE PYLON LN.FT 23 $1,000.00 $23,000.00
139 CONCRETE SPANDREL WALL AND FOOTING CU.YD(S) 47 $1,400.00 $65,800.00
140 CONCRETE MOMENT SLAB CU.YD(S) 86 $250.00 $21,500.00
141 CONCRETE BRIDGE PARAPET LN.FT 236 $910.00 $214,760.00
142 PRESSURE INJECTION, CONCRETE CRACKS LN.FT 158 $35.00 $5,530.00
143 RIPRAP STONE CHANNEL PROTECTION, 24" THICK (D50=12"), BRIDGE W-27 SQ.YD(S) 26 $350.00 $9,100.00
144 ARCH CONCRETE REPAIR SQ.FT 3 $2,400.00 $7,200.00
  • Posted By:
  • Monmouth County Purchasing
  • Hall of Records, 3rd Floor
  • 1 East Main St.
  • Freehold, NJ 07728
  • Phone: (732) 431-7370
  • Fax: (732) 431-7379
  • On behalf of:
  • Division of Engineering
  • Hall of Records Annex
  • 1 East Main Street
  • Freehold, NJ 07728

Contact: ENGINEERING DIVISION @ 732-431-7760

Delivery Date: 10/1/2025 - 7/31/2026