| Number | Item Description | Unit | Qty | Unit Price | Total |
|---|---|---|---|---|---|
|
COLONNELLI BROTHERS, INC.
(Total Awarded: $1,548,900.00)
201-440-1118 |
|||||
| 1 | PROGRESS SCHEDULE | LS | 1 | $2,500.00 | $2,500.00 |
| 2 | MOBILIZATION | LS | 1 | $115,000.00 | $115,000.00 |
| 3 | CONSTRUCTION LAYOUT | DOLLAR | 1000 | $1.00 | $1,000.00 |
| 4 | SILT FENCE | LN.FT | 380 | $7.00 | $2,660.00 |
| 5 | HAYBALE | UNIT(S) | 45 | $20.00 | $900.00 |
| 6 | FLOATING TURBIDITY BARRIER, TYPE 2 | LN.FT | 130 | $35.00 | $4,550.00 |
| 7 | SEDIMENT CONTROL BAG | SQ.FT | 200 | $18.00 | $3,600.00 |
| 8 | CONCRETE WASHOUT SYSTEM | LS | 1 | $5,000.00 | $5,000.00 |
| 9 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | UNIT(S) | 1 | $850.00 | $850.00 |
| 10 | BREAKAWAY BARRICADE | UNIT(S) | 8 | $45.00 | $360.00 |
| 11 | CONSTRUCTION SIGNS | SQ.FT | 100 | $18.00 | $1,800.00 |
| 12 | CONSTRUCTION BARRIER CURB | LN.FT | 160 | $40.00 | $6,400.00 |
| 13 | CLEARING SITE | LS | 1 | $65,000.00 | $65,000.00 |
| 14 | CLEARING SITE, BRIDGE (S-15) | LS | 1 | $85,000.00 | $85,000.00 |
| 15 | EXCAVATION, TEST PIT | CU.YD(S) | 2 | $75.00 | $150.00 |
| 16 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 310 | $60.00 | $18,600.00 |
| 17 | REMOVAL OF PAVEMENT | SQ.YD(S) | 262 | $15.00 | $3,930.00 |
| 18 | I-9 SOIL AGGREGATE | CU.YD(S) | 65 | $65.00 | $4,225.00 |
| 19 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 200 | $15.00 | $3,000.00 |
| 20 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 290 | $20.00 | $5,800.00 |
| 21 | TACK COAT | GAL(S) | 42 | $10.00 | $420.00 |
| 22 | PRIME COAT | GAL(S) | 18 | $10.00 | $180.00 |
| 23 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 82 | $225.00 | $18,450.00 |
| 24 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 73 | $200.00 | $14,600.00 |
| 25 | PERMANENT SHEETING | SQ.FT | 5200 | $20.00 | $104,000.00 |
| 26 | TEMPORARY COFFERDAM | LS | 1 | $118,000.00 | $118,000.00 |
| 27 | FURNISHING EQUIPMENT FOR DRIVING PILES | LS | 1 | $50,000.00 | $50,000.00 |
| 28 | DYNAMIC PILE LOAD TEST | UNIT(S) | 2 | $3,000.00 | $6,000.00 |
| 29 | CAST-IN-PLACE CONCRETE PILE, FURNISHED, 12" DIAMETER | LN.FT | 1224 | $95.00 | $116,280.00 |
| 30 | CAST-IN-PLACE CONCRETE PILE, DRIVEN, 12" DIAMETER | LN.FT | 1224 | $75.00 | $91,800.00 |
| 31 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 9000 | $3.00 | $27,000.00 |
| 32 | CONCRETE WING WALL | CU.YD(S) | 9 | $1,850.00 | $16,650.00 |
| 33 | CONCRETE ABUTMENT WALL | CU.YD(S) | 45 | $1,500.00 | $67,500.00 |
| 34 | EPOXY WATERPROOFING | SQ.YD(S) | 31 | $36.00 | $1,116.00 |
| 35 | DECK MEMBRANE | SQ.YD(S) | 163 | $45.00 | $7,335.00 |
| 36 | INSTALLATION OF PREFABRICATED ACROW TRUSS (60' SPAN) | LS | 1 | $180,000.00 | $180,000.00 |
| 37 | ACROW DECK PANELS | EACH | 13 | $4,500.00 | $58,500.00 |
| 38 | ACROW CURB PANELS | EACH | 13 | $4,500.00 | $58,500.00 |
| 39 | TIMBER WALE | BD. FT | 440 | $75.00 | $33,000.00 |
| 40 | RIPRAP STONE CHANNEL PROTECTION, 24" THICK (D50=12") | SQ.YD(S) | 60 | $250.00 | $15,000.00 |
| 41 | BEAM GUIDE RAIL | LN.FT | 225 | $75.00 | $16,875.00 |
| 42 | THRIE BEAM GUIDE RAIL, BRIDGE | LN.FT | 143 | $100.00 | $14,300.00 |
| 43 | TANGENT GUIDE RAIL TERMINAL | UNIT(S) | 2 | $7,500.00 | $15,000.00 |
| 44 | BEAM GUIDE RAIL POST, 9' LONG | UNIT(S) | 35 | $75.00 | $2,625.00 |
| 45 | APPROACH GUIDE RAIL TRANSITION TL-2 | UNIT(S) | 4 | $7,500.00 | $30,000.00 |
| 46 | REMOVAL OF BEAM GUIDE RAIL | LN.FT | 400 | $10.00 | $4,000.00 |
| 47 | TOPSOIL SPREADING 5" THICK | SQ.YD(S) | 250 | $7.00 | $1,750.00 |
| 48 | BORROW TOPSOIL | CU.YD(S) | 35 | $45.00 | $1,575.00 |
| 49 | FERTILIZING AND SEEDING, TYPE A-3 | SQ.YD(S) | 250 | $3.00 | $750.00 |
| 50 | STRAW MULCHING | SQ.YD(S) | 250 | $3.00 | $750.00 |
| 51 | TEMPORARY ACCESS ROADWAY | LS | 1 | $70,119.00 | $70,119.00 |
| 52 | SMALL DECIDUOUS TREE, 3-3 1/2" CALIPER, B&B | UNIT(S) | 6 | $750.00 | $4,500.00 |
| 53 | SMALL DECIDUOUS TREE, 2 1/2-3" CALIPER, B&B | UNIT(S) | 6 | $750.00 | $4,500.00 |
| 54 | DISPOSAL OF REGULATED MATERIAL | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 55 | UNANTICIPATED HARDWARE REPLACEMENT | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 56 | NJTA ESCROW | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 57 | REMOVAL OF TEMPORARY ACCESS ROADWAY | LS | 1 | $7,500.00 | $7,500.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760
Delivery Date: AS PER SPECIFICATIONS