Monmouth County Purchasing Division
F-60-2023
2023/2024 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS, IN THE COUNTY OF MONMOUTH FOR THE ESTIMATED TIME PERIOD OF AUGUST 1, 2023 THROUGH JULY 31, 2024
Number | Item Description | Unit | Qty | Unit Price | Total |
---|---|---|---|---|---|
MARBRO, INCORPORATED
(Total Awarded: $3,177,117.00)
973-744-8383 |
|||||
TIME AND MATERIAL | |||||
1 | PERFORMANCE BOND AND PAYMENT BOND | LS | 1 | $18,644.61 | $18,644.61 |
2 | OWNER’S & CONTRACTOR’S PROTECTIVE LIABILITY INSURANCE | LS | 1 | $10,000.00 | $10,000.00 |
3 | TRAFFIC DIRECTORS | HOUR(S) | 8 | $0.01 | $0.08 |
4 | UNIFORMED POLICE OFFICER ALLOWANCE | UNIT(S) | 10000 | $1.00 | $10,000.00 |
5 | BREAKAWAY BARRICADES | UNIT(S) | 5 | $0.01 | $0.05 |
6 | TRAFFIC CONES | UNIT(S) | 30 | $0.01 | $0.30 |
7 | DRUMS | UNIT(S) | 8 | $0.01 | $0.08 |
8 | CONSTRUCTION SIGNS, 48” X 48” | UNIT(S) | 4 | $0.01 | $0.04 |
9 | CONSTRUCTION SIGNS, 60” X 30” | UNIT(S) | 4 | $0.01 | $0.04 |
10 | CONSTRUCTION SIGNS, 48” X 24” | UNIT(S) | 4 | $0.01 | $0.04 |
11 | CONSTRUCTION SIGNS, 48” X 30” | UNIT(S) | 4 | $0.01 | $0.04 |
12 | FLOODLIGHTS FOR NIGHTTIME OPERATIONS | DAY(S) | 4 | $0.01 | $0.04 |
13 | ILLUMINATED FLASHING ARROWS, 4’ X 8’ | DAY(S) | 3 | $400.00 | $1,200.00 |
14 | TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE | UNIT(S) | 1 | $0.01 | $0.01 |
15 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS | DAY(S) | 3 | $400.00 | $1,200.00 |
16 | MOBILIZATION OF TRAFFIC CONTROL | DAY(S) | 5 | $0.01 | $0.05 |
17 | MATERIALS ALLOWANCE | UNIT(S) | 125000 | $1.00 | $125,000.00 |
18 | SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE | UNIT(S) | 50000 | $1.00 | $50,000.00 |
19 | MOBILIZATION OF LAND BASED PILE DRIVER-STD | HOUR(S) | 4 | $150.00 | $600.00 |
20 | MOBILIZATION OF LAND BASED PILE DRIVER-PREM | HOUR(S) | 2 | $150.00 | $300.00 |
21 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES – STD | HOUR(S) | 8 | $150.00 | $1,200.00 |
22 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 4 | $150.00 | $600.00 |
23 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – STD | HOUR(S) | 8 | $150.00 | $1,200.00 |
24 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – PREM | HOUR(S) | 4 | $150.00 | $600.00 |
25 | DIVER – STD | HOUR(S) | 16 | $750.00 | $12,000.00 |
26 | DIVER – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
27 | PE DIVER- STD | HOUR(S) | 8 | $900.00 | $7,200.00 |
28 | PE DIVER- PREM | HOUR(S) | 4 | $0.01 | $0.04 |
29 | SHOP PREPARATION – STD | HOUR(S) | 16 | $0.01 | $0.16 |
30 | SHOP PREPARATION – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
31 | SHOP FABRICATION – STD | HOUR(S) | 16 | $0.01 | $0.16 |
32 | SHOP FABRICATION – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
33 | TIMBER WORK – STD | HOUR(S) | 200 | $185.00 | $37,000.00 |
34 | TIMBER WORK – PREM | HOUR(S) | 50 | $75.00 | $3,750.00 |
35 | CONCRETE WORK – STD | HOUR(S) | 500 | $175.00 | $87,500.00 |
36 | CONCRETE WORK – PREM | HOUR(S) | 50 | $75.00 | $3,750.00 |
37 | STEEL WORK – STD | HOUR(S) | 125 | $175.00 | $21,875.00 |
38 | STEEL WORK – PREM | HOUR(S) | 50 | $75.00 | $3,750.00 |
39 | LABORER – STD | HOUR(S) | 800 | $110.00 | $88,000.00 |
40 | LABORER – PREM | HOUR(S) | 50 | $125.00 | $6,250.00 |
41 | 6” X 8” X 20” CONCRETE VERTICAL CURB | LN.FT | 100 | $45.00 | $4,500.00 |
42 | CONCRETE SIDEWALK, 4” THICK | SQ.YD(S) | 100 | $90.00 | $9,000.00 |
43 | CONCRETE DRIVEWAY, REINFORCED, 6” THICK | SQ.YD(S) | 80 | $95.00 | $7,600.00 |
44 | DETECTABLE WARNING SURFACE | SQ.YD(S) | 10 | $250.00 | $2,500.00 |
45 | REPAIR OF CONCRETE DECK, TYPE A | SQ.FT | 350 | $0.01 | $3.50 |
46 | REPAIR OF CONCRETE DECK, TYPE B | SQ.FT | 350 | $0.01 | $3.50 |
47 | REPAIR OF CONCRETE DECK, TYPE C | SQ.FT | 80 | $0.01 | $0.80 |
48 | TRAVEL – STD | HOUR(S) | 40 | $0.01 | $0.40 |
49 | TRAVEL – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
50 | ACCESS WORK BOAT | HOUR(S) | 40 | $50.00 | $2,000.00 |
51 | MANPOWER ACCESS MACHINE, SELF-PROPELLED | HOUR(S) | 8 | $50.00 | $400.00 |
52 | WORKING BARGE, SELF-PROPELLED – STD | HOUR(S) | 8 | $50.00 | $400.00 |
53 | WORKING BARGE, SELF-PROPELLED – PREM | HOUR(S) | 4 | $50.00 | $200.00 |
54 | AIR COMPRESSOR (150-225CFM) | HOUR(S) | 80 | $100.00 | $8,000.00 |
55 | FLOATING WORK PLATFORM | HOUR(S) | 24 | $50.00 | $1,200.00 |
56 | WATER BLAST CLEANING UNIT | HOUR(S) | 12 | $50.00 | $600.00 |
57 | PORTABLE CORE DRILL | HOUR(S) | 8 | $0.01 | $0.08 |
58 | JACKING SYSTEM, 100 TON | HOUR(S) | 8 | $0.01 | $0.08 |
59 | JACKING SYSTEM, (PAN CAKE), 100 TON | HOUR(S) | 4 | $0.01 | $0.04 |
60 | JACKING SYSTEM, 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
61 | JACKING SYSTEM, (PAN CAKE), 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
62 | MECHANICAL MORTAR/GROUT MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
63 | MECHANICAL CONCRETE MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
64 | BLAST CLEANING UNIT | HOUR(S) | 12 | $0.01 | $0.12 |
65 | WALK BEHIND CONCRETE SAW | HOUR(S) | 4 | $50.00 | $200.00 |
66 | DEWATERING | HOUR(S) | 40 | $0.01 | $0.40 |
67 | DELAMINATION SURVEY | HOUR(S) | 4 | $0.01 | $0.04 |
68 | PNEUMATICALLY APPLIED MORTAR SYSTEM | HOUR(S) | 4 | $50.00 | $200.00 |
69 | MUD JACKING SYSTEM | HOUR(S) | 8 | $50.00 | $400.00 |
70 | PICKUP TRUCK, 4 X 2, GAS POWERED, STD | HOUR(S) | 200 | $100.00 | $20,000.00 |
71 | PICKUP TRUCK, 4 X 2, GAS POWERED, PREM | HOUR(S) | 4 | $100.00 | $400.00 |
72 | STAKE BODY TRUCK – STD | HOUR(S) | 200 | $100.00 | $20,000.00 |
73 | STAKE BODY TRUCK – PREM | HOUR(S) | 4 | $100.00 | $400.00 |
74 | TRUCK MOUNTED CRANE – STD | HOUR(S) | 24 | $100.00 | $2,400.00 |
75 | TRUCK MOUNTED CRANE – PREM | HOUR(S) | 4 | $100.00 | $400.00 |
76 | EXCAVATOR -STD | HOUR(S) | 250 | $185.00 | $46,250.00 |
77 | EXCAVATOR -PREM | HOUR(S) | 8 | $185.00 | $1,480.00 |
78 | TELESCOPIC FORKLIFT - STD | HOUR(S) | 24 | $50.00 | $1,200.00 |
79 | TELESCOPIC FORKLIFT - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
80 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD | HOUR(S) | 8 | $50.00 | $400.00 |
81 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
82 | DUMP TRUCK, 10 CY – STD | HOUR(S) | 100 | $50.00 | $5,000.00 |
83 | DUMP TRUCK, 10 CY – PREM | HOUR(S) | 4 | $50.00 | $200.00 |
84 | TANDEM DUMP TRUCK, 16 CY – STD | HOUR(S) | 100 | $50.00 | $5,000.00 |
85 | TANDEM DUMP TRUCK, 16 CY – PREM | HOUR(S) | 4 | $50.00 | $200.00 |
86 | LAND BASED PILE DRIVER - STD | HOUR(S) | 20 | $400.00 | $8,000.00 |
87 | LAND BASED PILE DRIVER – PREM | HOUR(S) | 4 | $400.00 | $1,600.00 |
88 | BARGE BASED PILE DRIVER, 60 FOOT PILES, STD | HOUR(S) | 8 | $350.00 | $2,800.00 |
89 | BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 2 | $350.00 | $700.00 |
90 | COMBINATION LOADER/BACKHOE, STD | HOUR(S) | 75 | $125.00 | $9,375.00 |
91 | COMBINATION LOADER/BACKHOE, PREM | HOUR(S) | 4 | $125.00 | $500.00 |
92 | CONCRETE PUMP, STD | HOUR(S) | 8 | $150.00 | $1,200.00 |
93 | CONCRETE PUMP, PREM | HOUR(S) | 4 | $150.00 | $600.00 |
94 | SNOOPER, ON-CALL DAILY | DAY(S) | 1 | $3,500.00 | $3,500.00 |
95 | SNOOPER, ON-CALL WEEKLY | WEEK(S) | 1 | $0.01 | $0.01 |
SITE 1: BRIDGE U-2 | |||||
96 | CLEARING SITE | LS | 1 | $75,000.00 | $75,000.00 |
97 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 100 | $71.00 | $7,100.00 |
98 | I-9 SOIL AGGREGATE | CU.YD(S) | 110 | $118.00 | $12,980.00 |
99 | TEMPORARY COFFERDAM | LS | 1 | $60,174.35 | $60,174.35 |
100 | CONCRETE ABUTMENT WALL | CU.YD(S) | 40 | $3,200.00 | $128,000.00 |
101 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 7000 | $2.82 | $19,740.00 |
102 | SHOTCRETE, 6" THICK | SQ.YD(S) | 75 | $1,015.00 | $76,125.00 |
103 | BEAM GUIDE RAIL, BRIDGE | LN.FT | 78 | $476.00 | $37,128.00 |
104 | TIMBER WHEEL GUARD, 6"X6" – FURNISHED | LN.FT | 50 | $55.00 | $2,750.00 |
105 | TIMBER WHEEL GUARD, 6"X6" – INSTALLED | LN.FT | 36 | $36.00 | $1,296.00 |
106 | TIMBER SPACER BLOCK, 4"X6"X18"L – FURNISHED | LN.FT | 40 | $10.00 | $400.00 |
107 | TIMBER SPACER BLOCK, 4"X6"X18"L – INSTALLED | LN.FT | 18 | $72.00 | $1,296.00 |
108 | TIMBER SPACER BLOCK, 3"X10"X18"L – FURNISHED | LN.FT | 40 | $12.00 | $480.00 |
109 | TIMBER SPACER BLOCK, 3"X10"X18"L – INSTALLED | LN.FT | 18 | $0.01 | $0.18 |
110 | TIMBER ASPHALT BLOCK, 2"X6" – FURNISHED | LN.FT | 50 | $4.00 | $200.00 |
111 | TIMBER ASPHALT BLOCK, 2"X6" – INSTALLED | LN.FT | 36 | $0.01 | $0.36 |
112 | TIMBER DECK PLANK, 4"X8” – FURNISHED | LN.FT | 840 | $17.00 | $14,280.00 |
113 | TIMBER DECK PLANK, 4"X8” – INSTALLED | LN.FT | 655 | $16.00 | $10,480.00 |
114 | TIMBER STRINGER, 6"X16" – FURNISHED | LN.FT | 540 | $52.00 | $28,080.00 |
115 | TIMBER STRINGER, 6"X16" – INSTALLED | LN.FT | 380 | $33.00 | $12,540.00 |
116 | TIMBER CAP, 6"X12" – FURNISHED | LN.FT | 60 | $42.00 | $2,520.00 |
117 | TIMBER CAP, 6"X12" – INSTALLED | LN.FT | 46 | $55.00 | $2,530.00 |
118 | DRILLING AND GROUTING BOLTS / REINFORCING BARS | UNIT(S) | 350 | $30.00 | $10,500.00 |
SITE 2: BRIDGE MS-63 | |||||
119 | CONTROLLED FIELD SURVEY | LS | 1 | $2,000.00 | $2,000.00 |
120 | AS-BUILT FIELD SURVEY | LS | 1 | $4,000.00 | $4,000.00 |
121 | CLEARING SITE | LS | 1 | $43,000.00 | $43,000.00 |
122 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 350 | $38.00 | $13,300.00 |
123 | I-9 SOIL AGGREGATE | CU.YD(S) | 250 | $118.00 | $29,500.00 |
124 | CONTROLLED LOW STRENGTH MATERIAL (IF & WHERE DIRECTED) | CU.YD(S) | 25 | $142.00 | $3,550.00 |
125 | TEMPORARY COFFERDAM | LS | 1 | $275,000.00 | $275,000.00 |
126 | PERMANENT SHEETING | SQ.FT | 2700 | $5.00 | $13,500.00 |
127 | CONCRETE SHEET PILE CAP | CU.YD(S) | 14 | $2,200.00 | $30,800.00 |
128 | CONCRETE ABUTMENT WALL | CU.YD(S) | 20 | $1,725.00 | $34,500.00 |
129 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 7000 | $3.00 | $21,000.00 |
130 | STEEL 4 BAR BRIDGE RAILING | LN.FT | 63 | $475.00 | $29,925.00 |
131 | CONCRETE PYLON | LN.FT | 50 | $450.00 | $22,500.00 |
132 | PRECAST CONCRETE DECK PANELS, 7’ WIDE | LN.FT | 88 | $2,050.00 | $180,400.00 |
133 | REINFORCED ELASTOMERIC BEARING ASSEMBLY | UNIT(S) | 8 | $1,050.00 | $8,400.00 |
134 | BRIDGE IDENTIFICATION PLAQUE, 22"X22" | UNIT(S) | 1 | $1,800.00 | $1,800.00 |
135 | SHOTCRETE, 6" THICK | SQ.YD(S) | 35 | $2,000.00 | $70,000.00 |
136 | DRILLING AND GROUTING BOLTS / REINFORCING BARS | UNIT(S) | 234 | $31.00 | $7,254.00 |
137 | MEMBRANE WATERPROOFING | SQ.YD(S) | 60 | $55.00 | $3,300.00 |
SITE 3: BRIDGE MN-24 | |||||
138 | CONTROLLED FIELD SURVEY | LS | 1 | $2,000.00 | $2,000.00 |
139 | AS-BUILT FIELD SURVEY | LS | 1 | $4,000.00 | $4,000.00 |
140 | CONSTRUCTION LAYOUT | DOLLAR | 1 | $20,000.00 | $20,000.00 |
141 | CLEARING SITE | LS | 1 | $10,000.00 | $10,000.00 |
142 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 450 | $42.00 | $18,900.00 |
143 | I-9 SOIL AGGREGATE | CU.YD(S) | 265 | $118.00 | $31,270.00 |
144 | MAINTENANCE AND PROTECTION OF STREAM FLOW | LS | 1 | $165,000.00 | $165,000.00 |
145 | CONTROLLED LOW STRENGTH MATERIAL (IF & WHERE DIRECTED) | CU.YD(S) | 50 | $162.00 | $8,100.00 |
146 | COARSE AGGREGATE, NO. 57 | CU.YD(S) | 56 | $95.00 | $5,320.00 |
147 | CONCRETE FOOTING | CU.YD(S) | 42 | $735.00 | $30,870.00 |
148 | 48" REINFORCED CONCRETE PIPE | LN.FT | 62 | $312.00 | $19,344.00 |
149 | CONCRETE WINGWALL | CU.YD(S) | 40 | $1,760.00 | $70,400.00 |
150 | CONCRETE BRIDGE PARAPET, 3'-8" HIGH | LN.FT | 56 | $700.00 | $39,200.00 |
151 | RIPRAP STONE SLOPE PROTECTION, 18" THICK (D50=9") | SQ.YD(S) | 64 | $112.00 | $7,168.00 |
152 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 11000 | $3.00 | $33,000.00 |
153 | BRIDGE IDENTIFICATION PLAQUE, 22' X 22' | EACH | 1 | $1,800.00 | $1,800.00 |
SITE 4: BRIDGE A-55 | |||||
154 | CLEARING SITE, BRIDGE (A-55) | LS | 1 | $20,000.00 | $20,000.00 |
155 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 450 | $42.00 | $18,900.00 |
156 | I-14 SOIL AGGREGATE | CU.YD(S) | 189 | $70.00 | $13,230.00 |
157 | TEMPORARY COFFERDAM | LS | 1 | $320,000.00 | $320,000.00 |
158 | 6” PVC PIPE | LN.FT | 10 | $10.00 | $100.00 |
159 | FERNCO COUPLER | EACH | 1 | $30.00 | $30.00 |
160 | CONCRETE FOOTING | CU.YD(S) | 4 | $1,800.00 | $7,200.00 |
161 | 38”X60” REINFORCED CONCRETE ELLIPTICAL PIPE, CLASS HE-III | LN.FT | 53 | $327.00 | $17,331.00 |
162 | PIPE BEDDING (CLASS C), 6” THICK | CU.YD(S) | 12 | $72.00 | $864.00 |
163 | PRECAST CONCRETE CHAMBER NO. 1 | UNIT(S) | 1 | $7,000.00 | $7,000.00 |
164 | PRECAST CONCRETE CHAMBER NO. 2 | UNIT(S) | 1 | $10,000.00 | $10,000.00 |
165 | CASTING, TYPE A | UNIT(S) | 2 | $700.00 | $1,400.00 |
166 | GABION WALL | CU.YD(S) | 13 | $174.00 | $2,262.00 |
167 | GABION MATTRESS | CU.YD(S) | 38 | $226.00 | $8,588.00 |
SITE 5: BRIDGE W-7 | |||||
168 | 16" DIAMETER TIMBER PILE JACKE AND GROUT – FURNISHED | LN.FT | 132 | $333.00 | $43,956.00 |
169 | 16" DIAMETER TIMBER PILE JACKET AND GROUT – INSTALLED | LN.FT | 120 | $1,720.00 | $206,400.00 |
170 | 4"X12" TIMBER CROSS BRACING – FURNISHED | LN.FT | 60 | $32.00 | $1,920.00 |
171 | 4"X12" TIMBER CROSS BRACING – INSTALLED | LS | 1 | $73,000.00 | $73,000.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering & Traffic Safety
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760
Delivery Date: 8/1/2023 - 7/31/2024