F-60-2023


2023/2024 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS, IN THE COUNTY OF MONMOUTH FOR THE ESTIMATED TIME PERIOD OF AUGUST 1, 2023 THROUGH JULY 31, 2024

Awarded: 8/10/2023
Number Item Description Unit Qty Unit Price Total
MARBRO, INCORPORATED (Total Awarded: $3,177,117.00)
973-744-8383
TIME AND MATERIAL
1 PERFORMANCE BOND AND PAYMENT BOND LS 1 $18,644.61 $18,644.61
2 OWNER’S & CONTRACTOR’S PROTECTIVE LIABILITY INSURANCE LS 1 $10,000.00 $10,000.00
3 TRAFFIC DIRECTORS HOUR(S) 8 $0.01 $0.08
4 UNIFORMED POLICE OFFICER ALLOWANCE UNIT(S) 10000 $1.00 $10,000.00
5 BREAKAWAY BARRICADES UNIT(S) 5 $0.01 $0.05
6 TRAFFIC CONES UNIT(S) 30 $0.01 $0.30
7 DRUMS UNIT(S) 8 $0.01 $0.08
8 CONSTRUCTION SIGNS, 48” X 48” UNIT(S) 4 $0.01 $0.04
9 CONSTRUCTION SIGNS, 60” X 30” UNIT(S) 4 $0.01 $0.04
10 CONSTRUCTION SIGNS, 48” X 24” UNIT(S) 4 $0.01 $0.04
11 CONSTRUCTION SIGNS, 48” X 30” UNIT(S) 4 $0.01 $0.04
12 FLOODLIGHTS FOR NIGHTTIME OPERATIONS DAY(S) 4 $0.01 $0.04
13 ILLUMINATED FLASHING ARROWS, 4’ X 8’ DAY(S) 3 $400.00 $1,200.00
14 TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE UNIT(S) 1 $0.01 $0.01
15 TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS DAY(S) 3 $400.00 $1,200.00
16 MOBILIZATION OF TRAFFIC CONTROL DAY(S) 5 $0.01 $0.05
17 MATERIALS ALLOWANCE UNIT(S) 125000 $1.00 $125,000.00
18 SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE UNIT(S) 50000 $1.00 $50,000.00
19 MOBILIZATION OF LAND BASED PILE DRIVER-STD HOUR(S) 4 $150.00 $600.00
20 MOBILIZATION OF LAND BASED PILE DRIVER-PREM HOUR(S) 2 $150.00 $300.00
21 MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES – STD HOUR(S) 8 $150.00 $1,200.00
22 MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM HOUR(S) 4 $150.00 $600.00
23 MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – STD HOUR(S) 8 $150.00 $1,200.00
24 MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – PREM HOUR(S) 4 $150.00 $600.00
25 DIVER – STD HOUR(S) 16 $750.00 $12,000.00
26 DIVER – PREM HOUR(S) 4 $0.01 $0.04
27 PE DIVER- STD HOUR(S) 8 $900.00 $7,200.00
28 PE DIVER- PREM HOUR(S) 4 $0.01 $0.04
29 SHOP PREPARATION – STD HOUR(S) 16 $0.01 $0.16
30 SHOP PREPARATION – PREM HOUR(S) 4 $0.01 $0.04
31 SHOP FABRICATION – STD HOUR(S) 16 $0.01 $0.16
32 SHOP FABRICATION – PREM HOUR(S) 4 $0.01 $0.04
33 TIMBER WORK – STD HOUR(S) 200 $185.00 $37,000.00
34 TIMBER WORK – PREM HOUR(S) 50 $75.00 $3,750.00
35 CONCRETE WORK – STD HOUR(S) 500 $175.00 $87,500.00
36 CONCRETE WORK – PREM HOUR(S) 50 $75.00 $3,750.00
37 STEEL WORK – STD HOUR(S) 125 $175.00 $21,875.00
38 STEEL WORK – PREM HOUR(S) 50 $75.00 $3,750.00
39 LABORER – STD HOUR(S) 800 $110.00 $88,000.00
40 LABORER – PREM HOUR(S) 50 $125.00 $6,250.00
41 6” X 8” X 20” CONCRETE VERTICAL CURB LN.FT 100 $45.00 $4,500.00
42 CONCRETE SIDEWALK, 4” THICK SQ.YD(S) 100 $90.00 $9,000.00
43 CONCRETE DRIVEWAY, REINFORCED, 6” THICK SQ.YD(S) 80 $95.00 $7,600.00
44 DETECTABLE WARNING SURFACE SQ.YD(S) 10 $250.00 $2,500.00
45 REPAIR OF CONCRETE DECK, TYPE A SQ.FT 350 $0.01 $3.50
46 REPAIR OF CONCRETE DECK, TYPE B SQ.FT 350 $0.01 $3.50
47 REPAIR OF CONCRETE DECK, TYPE C SQ.FT 80 $0.01 $0.80
48 TRAVEL – STD HOUR(S) 40 $0.01 $0.40
49 TRAVEL – PREM HOUR(S) 4 $0.01 $0.04
50 ACCESS WORK BOAT HOUR(S) 40 $50.00 $2,000.00
51 MANPOWER ACCESS MACHINE, SELF-PROPELLED HOUR(S) 8 $50.00 $400.00
52 WORKING BARGE, SELF-PROPELLED – STD HOUR(S) 8 $50.00 $400.00
53 WORKING BARGE, SELF-PROPELLED – PREM HOUR(S) 4 $50.00 $200.00
54 AIR COMPRESSOR (150-225CFM) HOUR(S) 80 $100.00 $8,000.00
55 FLOATING WORK PLATFORM HOUR(S) 24 $50.00 $1,200.00
56 WATER BLAST CLEANING UNIT HOUR(S) 12 $50.00 $600.00
57 PORTABLE CORE DRILL HOUR(S) 8 $0.01 $0.08
58 JACKING SYSTEM, 100 TON HOUR(S) 8 $0.01 $0.08
59 JACKING SYSTEM, (PAN CAKE), 100 TON HOUR(S) 4 $0.01 $0.04
60 JACKING SYSTEM, 50 TON HOUR(S) 8 $0.01 $0.08
61 JACKING SYSTEM, (PAN CAKE), 50 TON HOUR(S) 8 $0.01 $0.08
62 MECHANICAL MORTAR/GROUT MIXER HOUR(S) 8 $50.00 $400.00
63 MECHANICAL CONCRETE MIXER HOUR(S) 8 $50.00 $400.00
64 BLAST CLEANING UNIT HOUR(S) 12 $0.01 $0.12
65 WALK BEHIND CONCRETE SAW HOUR(S) 4 $50.00 $200.00
66 DEWATERING HOUR(S) 40 $0.01 $0.40
67 DELAMINATION SURVEY HOUR(S) 4 $0.01 $0.04
68 PNEUMATICALLY APPLIED MORTAR SYSTEM HOUR(S) 4 $50.00 $200.00
69 MUD JACKING SYSTEM HOUR(S) 8 $50.00 $400.00
70 PICKUP TRUCK, 4 X 2, GAS POWERED, STD HOUR(S) 200 $100.00 $20,000.00
71 PICKUP TRUCK, 4 X 2, GAS POWERED, PREM HOUR(S) 4 $100.00 $400.00
72 STAKE BODY TRUCK – STD HOUR(S) 200 $100.00 $20,000.00
73 STAKE BODY TRUCK – PREM HOUR(S) 4 $100.00 $400.00
74 TRUCK MOUNTED CRANE – STD HOUR(S) 24 $100.00 $2,400.00
75 TRUCK MOUNTED CRANE – PREM HOUR(S) 4 $100.00 $400.00
76 EXCAVATOR -STD HOUR(S) 250 $185.00 $46,250.00
77 EXCAVATOR -PREM HOUR(S) 8 $185.00 $1,480.00
78 TELESCOPIC FORKLIFT - STD HOUR(S) 24 $50.00 $1,200.00
79 TELESCOPIC FORKLIFT - PREM HOUR(S) 4 $0.01 $0.04
80 MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD HOUR(S) 8 $50.00 $400.00
81 MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM HOUR(S) 4 $0.01 $0.04
82 DUMP TRUCK, 10 CY – STD HOUR(S) 100 $50.00 $5,000.00
83 DUMP TRUCK, 10 CY – PREM HOUR(S) 4 $50.00 $200.00
84 TANDEM DUMP TRUCK, 16 CY – STD HOUR(S) 100 $50.00 $5,000.00
85 TANDEM DUMP TRUCK, 16 CY – PREM HOUR(S) 4 $50.00 $200.00
86 LAND BASED PILE DRIVER - STD HOUR(S) 20 $400.00 $8,000.00
87 LAND BASED PILE DRIVER – PREM HOUR(S) 4 $400.00 $1,600.00
88 BARGE BASED PILE DRIVER, 60 FOOT PILES, STD HOUR(S) 8 $350.00 $2,800.00
89 BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM HOUR(S) 2 $350.00 $700.00
90 COMBINATION LOADER/BACKHOE, STD HOUR(S) 75 $125.00 $9,375.00
91 COMBINATION LOADER/BACKHOE, PREM HOUR(S) 4 $125.00 $500.00
92 CONCRETE PUMP, STD HOUR(S) 8 $150.00 $1,200.00
93 CONCRETE PUMP, PREM HOUR(S) 4 $150.00 $600.00
94 SNOOPER, ON-CALL DAILY DAY(S) 1 $3,500.00 $3,500.00
95 SNOOPER, ON-CALL WEEKLY WEEK(S) 1 $0.01 $0.01
SITE 1: BRIDGE U-2
96 CLEARING SITE LS 1 $75,000.00 $75,000.00
97 EXCAVATION, UNCLASSIFIED CU.YD(S) 100 $71.00 $7,100.00
98 I-9 SOIL AGGREGATE CU.YD(S) 110 $118.00 $12,980.00
99 TEMPORARY COFFERDAM LS 1 $60,174.35 $60,174.35
100 CONCRETE ABUTMENT WALL CU.YD(S) 40 $3,200.00 $128,000.00
101 REINFORCEMENT STEEL, GALVANIZED LB(S) 7000 $2.82 $19,740.00
102 SHOTCRETE, 6" THICK SQ.YD(S) 75 $1,015.00 $76,125.00
103 BEAM GUIDE RAIL, BRIDGE LN.FT 78 $476.00 $37,128.00
104 TIMBER WHEEL GUARD, 6"X6" – FURNISHED LN.FT 50 $55.00 $2,750.00
105 TIMBER WHEEL GUARD, 6"X6" – INSTALLED LN.FT 36 $36.00 $1,296.00
106 TIMBER SPACER BLOCK, 4"X6"X18"L – FURNISHED LN.FT 40 $10.00 $400.00
107 TIMBER SPACER BLOCK, 4"X6"X18"L – INSTALLED LN.FT 18 $72.00 $1,296.00
108 TIMBER SPACER BLOCK, 3"X10"X18"L – FURNISHED LN.FT 40 $12.00 $480.00
109 TIMBER SPACER BLOCK, 3"X10"X18"L – INSTALLED LN.FT 18 $0.01 $0.18
110 TIMBER ASPHALT BLOCK, 2"X6" – FURNISHED LN.FT 50 $4.00 $200.00
111 TIMBER ASPHALT BLOCK, 2"X6" – INSTALLED LN.FT 36 $0.01 $0.36
112 TIMBER DECK PLANK, 4"X8” – FURNISHED LN.FT 840 $17.00 $14,280.00
113 TIMBER DECK PLANK, 4"X8” – INSTALLED LN.FT 655 $16.00 $10,480.00
114 TIMBER STRINGER, 6"X16" – FURNISHED LN.FT 540 $52.00 $28,080.00
115 TIMBER STRINGER, 6"X16" – INSTALLED LN.FT 380 $33.00 $12,540.00
116 TIMBER CAP, 6"X12" – FURNISHED LN.FT 60 $42.00 $2,520.00
117 TIMBER CAP, 6"X12" – INSTALLED LN.FT 46 $55.00 $2,530.00
118 DRILLING AND GROUTING BOLTS / REINFORCING BARS UNIT(S) 350 $30.00 $10,500.00
SITE 2: BRIDGE MS-63
119 CONTROLLED FIELD SURVEY LS 1 $2,000.00 $2,000.00
120 AS-BUILT FIELD SURVEY LS 1 $4,000.00 $4,000.00
121 CLEARING SITE LS 1 $43,000.00 $43,000.00
122 EXCAVATION, UNCLASSIFIED CU.YD(S) 350 $38.00 $13,300.00
123 I-9 SOIL AGGREGATE CU.YD(S) 250 $118.00 $29,500.00
124 CONTROLLED LOW STRENGTH MATERIAL (IF & WHERE DIRECTED) CU.YD(S) 25 $142.00 $3,550.00
125 TEMPORARY COFFERDAM LS 1 $275,000.00 $275,000.00
126 PERMANENT SHEETING SQ.FT 2700 $5.00 $13,500.00
127 CONCRETE SHEET PILE CAP CU.YD(S) 14 $2,200.00 $30,800.00
128 CONCRETE ABUTMENT WALL CU.YD(S) 20 $1,725.00 $34,500.00
129 REINFORCEMENT STEEL, GALVANIZED LB(S) 7000 $3.00 $21,000.00
130 STEEL 4 BAR BRIDGE RAILING LN.FT 63 $475.00 $29,925.00
131 CONCRETE PYLON LN.FT 50 $450.00 $22,500.00
132 PRECAST CONCRETE DECK PANELS, 7’ WIDE LN.FT 88 $2,050.00 $180,400.00
133 REINFORCED ELASTOMERIC BEARING ASSEMBLY UNIT(S) 8 $1,050.00 $8,400.00
134 BRIDGE IDENTIFICATION PLAQUE, 22"X22" UNIT(S) 1 $1,800.00 $1,800.00
135 SHOTCRETE, 6" THICK SQ.YD(S) 35 $2,000.00 $70,000.00
136 DRILLING AND GROUTING BOLTS / REINFORCING BARS UNIT(S) 234 $31.00 $7,254.00
137 MEMBRANE WATERPROOFING SQ.YD(S) 60 $55.00 $3,300.00
SITE 3: BRIDGE MN-24
138 CONTROLLED FIELD SURVEY LS 1 $2,000.00 $2,000.00
139 AS-BUILT FIELD SURVEY LS 1 $4,000.00 $4,000.00
140 CONSTRUCTION LAYOUT DOLLAR 1 $20,000.00 $20,000.00
141 CLEARING SITE LS 1 $10,000.00 $10,000.00
142 EXCAVATION, UNCLASSIFIED CU.YD(S) 450 $42.00 $18,900.00
143 I-9 SOIL AGGREGATE CU.YD(S) 265 $118.00 $31,270.00
144 MAINTENANCE AND PROTECTION OF STREAM FLOW LS 1 $165,000.00 $165,000.00
145 CONTROLLED LOW STRENGTH MATERIAL (IF & WHERE DIRECTED) CU.YD(S) 50 $162.00 $8,100.00
146 COARSE AGGREGATE, NO. 57 CU.YD(S) 56 $95.00 $5,320.00
147 CONCRETE FOOTING CU.YD(S) 42 $735.00 $30,870.00
148 48" REINFORCED CONCRETE PIPE LN.FT 62 $312.00 $19,344.00
149 CONCRETE WINGWALL CU.YD(S) 40 $1,760.00 $70,400.00
150 CONCRETE BRIDGE PARAPET, 3'-8" HIGH LN.FT 56 $700.00 $39,200.00
151 RIPRAP STONE SLOPE PROTECTION, 18" THICK (D50=9") SQ.YD(S) 64 $112.00 $7,168.00
152 REINFORCEMENT STEEL, GALVANIZED LB(S) 11000 $3.00 $33,000.00
153 BRIDGE IDENTIFICATION PLAQUE, 22' X 22' EACH 1 $1,800.00 $1,800.00
SITE 4: BRIDGE A-55
154 CLEARING SITE, BRIDGE (A-55) LS 1 $20,000.00 $20,000.00
155 EXCAVATION, UNCLASSIFIED CU.YD(S) 450 $42.00 $18,900.00
156 I-14 SOIL AGGREGATE CU.YD(S) 189 $70.00 $13,230.00
157 TEMPORARY COFFERDAM LS 1 $320,000.00 $320,000.00
158 6” PVC PIPE LN.FT 10 $10.00 $100.00
159 FERNCO COUPLER EACH 1 $30.00 $30.00
160 CONCRETE FOOTING CU.YD(S) 4 $1,800.00 $7,200.00
161 38”X60” REINFORCED CONCRETE ELLIPTICAL PIPE, CLASS HE-III LN.FT 53 $327.00 $17,331.00
162 PIPE BEDDING (CLASS C), 6” THICK CU.YD(S) 12 $72.00 $864.00
163 PRECAST CONCRETE CHAMBER NO. 1 UNIT(S) 1 $7,000.00 $7,000.00
164 PRECAST CONCRETE CHAMBER NO. 2 UNIT(S) 1 $10,000.00 $10,000.00
165 CASTING, TYPE A UNIT(S) 2 $700.00 $1,400.00
166 GABION WALL CU.YD(S) 13 $174.00 $2,262.00
167 GABION MATTRESS CU.YD(S) 38 $226.00 $8,588.00
SITE 5: BRIDGE W-7
168 16" DIAMETER TIMBER PILE JACKE AND GROUT – FURNISHED LN.FT 132 $333.00 $43,956.00
169 16" DIAMETER TIMBER PILE JACKET AND GROUT – INSTALLED LN.FT 120 $1,720.00 $206,400.00
170 4"X12" TIMBER CROSS BRACING – FURNISHED LN.FT 60 $32.00 $1,920.00
171 4"X12" TIMBER CROSS BRACING – INSTALLED LS 1 $73,000.00 $73,000.00
  • Posted By:
  • Monmouth County Purchasing
  • Hall of Records, 3rd Floor
  • 1 East Main St.
  • Freehold, NJ 07728
  • Phone: (732) 431-7370
  • Fax: (732) 431-7379
  • On behalf of:
  • Division of Engineering & Traffic Safety
  • Hall of Records Annex
  • 1 East Main Street
  • Freehold, NJ 07728

Contact: ENGINEERING DIVISION @ 732-431-7760

Delivery Date: 8/1/2023 - 7/31/2024