Monmouth County Purchasing Division
F-62-2025
REPLACEMENT OF BRIDGE A-38 ON COUNTY ROUTE 54 (PHALANX ROAD) OVER SWIMMING RIVER RESERVOIR IN THE TOWNSHIP OF COLTS NECK AND TOWNSHIP OF MIDDLETOWN
Awarded:
7/10/2025
| Number | Item Description | Unit | Qty | Unit Price | Total |
|---|---|---|---|---|---|
|
MARBRO, INCORPORATED
(Total Awarded: $22,717,117.00)
973-744-8383 |
|||||
| 1 | PROGRESS SCHEDULE | LS | 1 | $12,000.00 | $12,000.00 |
| 2 | MOBILIZATION | LS | 1 | $2,000,000.00 | $2,000,000.00 |
| 3 | CONSTRUCTION LAYOUT | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 4 | MONUMENT | UNIT(S) | 2 | $900.00 | $1,800.00 |
| 5 | SILT FENCE | LN.FT | 3410 | $3.00 | $10,230.00 |
| 6 | HAYBALE | UNIT(S) | 120 | $24.00 | $2,880.00 |
| 7 | FLOATING TURBIDITY BARRIER, TYPE 2 | LN.FT | 479 | $27.00 | $12,933.00 |
| 8 | SEDIMENT CONTROL BAG | SQ.FT | 4 | $80.00 | $320.00 |
| 9 | CONSTRUCTION DRIVEWAY | TON(S) | 192 | $51.00 | $9,792.00 |
| 10 | CONCRETE WASHOUT SYSTEM | LS | 1 | $6,000.00 | $6,000.00 |
| 11 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | UNIT(S) | 1 | $1,200.00 | $1,200.00 |
| 12 | BREAKAWAY BARRICADE | UNIT(S) | 31 | $165.00 | $5,115.00 |
| 13 | DRUM | UNIT(S) | 40 | $80.00 | $3,200.00 |
| 14 | TRAFFIC CONE | UNIT(S) | 40 | $21.00 | $840.00 |
| 15 | CONSTRUCTION SIGNS | SQ.FT | 912 | $14.00 | $12,768.00 |
| 16 | CONSTRUCTION BARRIER CURB | LN.FT | 2400 | $120.00 | $288,000.00 |
| 17 | PORTABLE VARIABLE MESSAGE SIGN | UNIT(S) | 2 | $15,000.00 | $30,000.00 |
| 18 | TEMPORARY CRASH CUSHION, INERTIAL BARRIER SYSTEM, 7 MODULES | UNIT(S) | 5 | $4,800.00 | $24,000.00 |
| 19 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHION | UNIT(S) | 2 | $5,000.00 | $10,000.00 |
| 20 | TRAFFIC STRIPES, LATEX, 4" | LN.FT | 23654 | $0.25 | $5,913.50 |
| 21 | TEMPORARY PAVEMENT MARKERS | UNIT(S) | 256 | $8.70 | $2,227.20 |
| 22 | UNIFORM POLICE OFFICER ALLOWANCE | DOLLARS | 60000 | $1.00 | $60,000.00 |
| 23 | PROJECT IDENTIFICATION SIGN, 4'X6' | UNIT(S) | 2 | $850.00 | $1,700.00 |
| 24 | FUEL PRICE ADJUSTMENT | DOLLARS | 99900 | $1.00 | $99,900.00 |
| 25 | ASPHALT PRICE ADJUSTMENT | DOLLARS | 6900 | $1.00 | $6,900.00 |
| 26 | CLEARING SITE | LS | 1 | $100,000.00 | $100,000.00 |
| 27 | CLEARING SITE, BRIDGE A-38 | LS | 1 | $375,000.00 | $375,000.00 |
| 28 | DISPOSAL OF REGULATED MATERIAL | TON(S) | 3883 | $51.00 | $198,033.00 |
| 29 | EXCAVATION, TEST PIT | CU.YD(S) | 6 | $780.00 | $4,680.00 |
| 30 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 5485 | $67.00 | $367,495.00 |
| 31 | I-9 SOIL AGGREGATE | CU.YD(S) | 5316 | $67.00 | $356,172.00 |
| 32 | I-14 SOIL AGGREGATE | CU.YD(S) | 10195 | $56.00 | $570,920.00 |
| 33 | GEOTEXTILE | SQ.YD(S) | 868 | $1.00 | $868.00 |
| 34 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 6641 | $17.00 | $112,897.00 |
| 35 | COARSE AGGREGATE, SIZE NO. 57 | CU.YD(S) | 372 | $55.00 | $20,460.00 |
| 36 | RUBBLIZATION | SQ.YD(S) | 2283 | $4.00 | $9,132.00 |
| 37 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 1246 | $14.00 | $17,444.00 |
| 38 | POLYMERIZED JOINT ADHESIVE | LN.FT | 1820 | $4.00 | $7,280.00 |
| 39 | TACK COAT | GAL(S) | 648 | $25.00 | $16,200.00 |
| 40 | PRIME COAT | GAL(S) | 507 | $0.01 | $5.07 |
| 41 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 1058 | $160.00 | $169,280.00 |
| 42 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 2386 | $160.00 | $381,760.00 |
| 43 | TEMPORARY SHEETING | SQ.FT | 4142 | $10.00 | $41,420.00 |
| 44 | PERMANENT SHEETING | SQ.FT | 18593 | $10.00 | $185,930.00 |
| 45 | TEMPORARY COFFERDAM | LS | 1 | $5,950,021.88 | $5,950,021.88 |
| 46 | FURNISHING EQUIPMENT FOR DRIVING PILES | LS | 1 | $1,750,000.00 | $1,750,000.00 |
| 47 | TEST PILE, FURNISHED | LN.FT | 1556 | $63.00 | $98,028.00 |
| 48 | TEST PILE, DRIVEN | LN.FT | 1556 | $10.00 | $15,560.00 |
| 49 | DYNAMIC PILE LOAD TEST | UNIT(S) | 20 | $2,200.00 | $44,000.00 |
| 50 | CAST-IN-PLACE CONCRETE PILE, FURNISHED, 12" DIAMETER | LN.FT | 22053 | $59.00 | $1,301,127.00 |
| 51 | CAST-IN-PLACE CONCRETE PILE, FURNISHED, 18" DIAMETER | LN.FT | 8124 | $84.00 | $682,416.00 |
| 52 | CAST-IN-PLACE CONCRETE PILE, DRIVEN, 12" DIAMETER | LN.FT | 22053 | $10.00 | $220,530.00 |
| 53 | CAST-IN-PLACE CONCRETE PILE, DRIVEN, 18" DIAMETER | LN.FT | 8124 | $10.00 | $81,240.00 |
| 54 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 402820 | $2.40 | $966,768.00 |
| 55 | CONCRETE FOOTING | CU.YD(S) | 1152 | $500.00 | $576,000.00 |
| 56 | CONCRETE WING WALL | CU.YD(S) | 1011 | $1,200.00 | $1,213,200.00 |
| 57 | CONCRETE ABUTMENT WALL | CU.YD(S) | 210 | $1,250.00 | $262,500.00 |
| 58 | CONCRETE DIAPHRAGM | CU.YD(S) | 22 | $4,800.00 | $105,600.00 |
| 59 | EPOXY WATERPROOFING | SQ.YD(S) | 47 | $78.00 | $3,666.00 |
| 60 | CONCRETE PYLON | LN.FT | 53 | $460.00 | $24,380.00 |
| 61 | PRESTRESS CONCRETE PA-BULB TEE BEAM | LN.FT | 948 | $750.00 | $711,000.00 |
| 62 | REINFORCED ELASTOMERIC BEARING ASSEMBLY | UNIT(S) | 16 | $5,000.00 | $80,000.00 |
| 63 | STRIP SEAL EXPANSION JOINT ASSEMBLY | LN.FT | 95 | $700.00 | $66,500.00 |
| 64 | CONCRETE BRIDGE DECK | CU.YD(S) | 191 | $1,800.00 | $343,800.00 |
| 65 | CONCRETE BRIDGE SIDEWALK | CU.YD(S) | 49 | $1,000.00 | $49,000.00 |
| 66 | CONCRETE BRIDGE APPROACH | CU.YD(S) | 100 | $1,000.00 | $100,000.00 |
| 67 | NYSDOT 3-BAR BRIDGE RAIL | LN.FT | 706 | $540.00 | $381,240.00 |
| 68 | CHAIN-LINK FENCE, ALUMINUM-COATED STEEL, BRIDGE, 4' 0" HIGH | LN.FT | 2174 | $70.00 | $152,180.00 |
| 69 | 8" PERFORATED HIGH DENSITY POLYETHYLENE PIPE | LN.FT | 599 | $45.00 | $26,955.00 |
| 70 | 9" X 18" CONCRETE VERTICAL CURB | LN.FT | 100 | $75.00 | $7,500.00 |
| 71 | RPM, BI-DIRECTIONAL, AMBER LENS | UNIT(S) | 40 | $45.00 | $1,800.00 |
| 72 | UTILITY SUPPORT, BRIDGE | UNIT(S) | 12 | $500.00 | $6,000.00 |
| 73 | CONCRETE SHEET PILE CAP | LN.FT | 2113 | $475.00 | $1,003,675.00 |
| 74 | IDENTIFICATION PLAQUE | UNIT(S) | 1 | $2,600.00 | $2,600.00 |
| 75 | BRIDGE DECK AND BRIDGE APPROACH SEALING | SQ.FT | 7880 | $2.00 | $15,760.00 |
| 76 | RIPRAP STONE CHANNEL PROTECTION, 36" THICK (D50=18") | SQ.YD(S) | 286 | $122.00 | $34,892.00 |
| 77 | NONVEGETATIVE SURFACE, BROKEN STONE, 4" THICK | SQ.YD(S) | 829 | $20.00 | $16,580.00 |
| 78 | BEAM GUIDE RAIL, POWDER COATED | LN.FT | 2130 | $75.00 | $159,750.00 |
| 79 | TANGENT GUIDE RAIL TERMINAL, POWDER COATED | UNIT(S) | 4 | $6,800.00 | $27,200.00 |
| 80 | APPROACH GUIDE RAIL TRANSITION TL-3, POWDER COATED | UNIT(S) | 4 | $7,900.00 | $31,600.00 |
| 81 | TRAFFIC STRIPES, 4" | LN.FT | 9043 | $0.50 | $4,521.50 |
| 82 | TRAFFIC STRIPES, LONG LASTING, THERMOPLASTIC, 4" | LN.FT | 513 | $3.00 | $1,539.00 |
| 83 | REMOVAL OF TRAFFIC STRIPES | LN.FT | 33295 | $0.55 | $18,312.25 |
| 84 | REGULATORY AND WARNING SIGN | SQ.FT | 79 | $45.00 | $3,555.00 |
| 85 | TEMPORARY TRAFFIC SIGNAL SYSTEM | LS | 1 | $125,000.00 | $125,000.00 |
| 86 | TOPSOIL SPREADING 5" THICK | SQ.YD(S) | 2372 | $7.55 | $17,908.60 |
| 87 | BORROW TOPSOIL | CU.YD(S) | 1261 | $80.00 | $100,880.00 |
| 88 | FERTILIZING AND SEEDING, TYPE A | SQ.YD(S) | 4001 | $1.00 | $4,001.00 |
| 89 | STRAW MULCHING | SQ.YD(S) | 4001 | $3.00 | $12,003.00 |
| 90 | WOOD MULCHING | SQ.YD(S) | 262 | $14.00 | $3,668.00 |
| 91 | LARGE DECIDUOUS TREE, 2-2 1/2" CALIPER, B&B | UNIT(S) | 103 | $400.00 | $41,200.00 |
| 92 | SMALL DECIDUOUS TREE, 2-2 1/2" CALIPER, B&B | UNIT(S) | 50 | $400.00 | $20,000.00 |
| 93 | EVERGREEN TREE, 6-7' HIGH, B&B | UNIT(S) | 17 | $525.00 | $8,925.00 |
| 94 | PLANT ESTABLISHMENT PERIOD | LS | 1 | $13,000.00 | $13,000.00 |
| 95 | DEER FENCE, TEMPORARY | LN.FT | 1221 | $40.00 | $48,840.00 |
| 96 | TEMPORARY SHIELDING | LS | 1 | $75,000.00 | $75,000.00 |
| 97 | FIELD OFFICE TYPE B SET UP | UNIT(S) | 1 | $18,000.00 | $18,000.00 |
| 98 | FIELD OFFICE TYPE B MAINTENANCE | MONTH(S) | 24 | $2,000.00 | $48,000.00 |
| 99 | STEEL PRICE ADJUSTMENT | DOLLAR | 77000 | $1.00 | $77,000.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760