Monmouth County Purchasing Division

F-63-2024


REPLACEMENT OF BRIDGE MT-18 ON WHIPPORWILL VALLEY ROAD AND BRIDGE MT-19 ON CHAPEL HILL ROAD OVER MCCLEES CREEK IN THE TOWNSHIP OF MIDDLETOWN

Awarded: 7/11/2024
Number Item Description Unit Qty Unit Price Total
RENCOR, INCORPORATED (Total Awarded: $2,452,953.05)
908-534-2131
BRIDGE MT-18
1 BAR CHART PROGRESS SCHEDULE AND UPDATES LS 1 $1,600.00 $1,600.00
2 MOBILIZATION LS 1 $45,000.00 $45,000.00
3 MONUMENT UNIT(S) 3 $900.00 $2,700.00
4 SILT FENCE LN.FT 915 $5.00 $4,575.00
5 INLET FILTER TYPE 2, 2' X 4' UNIT(S) 1 $75.00 $75.00
6 FLOATING TURBIDITY BARRIER, TYPE 1 LN.FT 16 $5.00 $80.00
7 CONCRETE WASHOUT SYSTEM LS 1 $4,000.00 $4,000.00
8 OIL ONLY EMERGENCY SPILL KIT, TYPE 1 UNIT(S) 2 $120.00 $240.00
9 BREAKAWAY BARRICADE UNIT(S) 10 $1.00 $10.00
10 DRUM UNIT(S) 15 $1.00 $15.00
11 TRAFFIC CONE UNIT(S) 15 $1.00 $15.00
12 CONSTRUCTION SIGNS SQ.FT 242 $18.00 $4,356.00
13 CONSTRUCTION BARRIER CURB LN.FT 40 $65.00 $2,600.00
14 PORTABLE VARIABLE MESSAGE SIGN UNIT(S) 2 $1,750.00 $3,500.00
15 CONSTRUCTION IDENTIFICATION SIGN, 6' X 4' UNIT(S) 2 $800.00 $1,600.00
16 UNIFORMED POLICE OFFICERS ALLOWANCE DOLLARS 10000 $1.00 $10,000.00
17 FUEL PRICE ADJUSTMENT DOLLARS 1000 $1.00 $1,000.00
18 ASPHALT PRICE ADJUSTMENT DOLLARS 1000 $1.00 $1,000.00
19 VIBRATION MONITORING LS 1 $7,500.00 $7,500.00
20 CLEARING SITE LS 1 $40,000.00 $40,000.00
21 EXCAVATION, UNCLASSIFIED CU.YD(S) 840 $65.00 $54,600.00
22 DISPOSAL OF REGULATED MATERIALS AND ACID PRODUCING SOILS. ALLOWANCE DOLLARS 20000 $1.00 $20,000.00
23 MATERIAL SAMPLING AND ANALYSES, REGULATED, ALLOWANCE DOLLARS 2000 $1.00 $2,000.00
24 I-9 SOIL AGGREGATE CU.YD(S) 205 $180.00 $36,900.00
25 CONTROLLED LOW STRENGTH MATERIAL CU.YD(S) 50 $190.00 $9,500.00
26 DENSE-GRADED AGGREGATE BASE COURSE, 8" THICK SQ.YD(S) 1030 $30.00 $30,900.00
27 SURFACE GRAVEL, 4" THICK SQ.YD(S) 1140 $25.00 $28,500.00
28 RESET FENCE LN.FT 60 $54.00 $3,240.00
29 HOT MIX ASPHALT DRIVEWAY, 4" THICK SQ.YD(S) 14 $215.00 $3,010.00
30 6" X 8" X 20" CONCRETE VERTICAL CURB LN.FT 141 $85.00 $11,985.00
31 BEAM GUIDE RAIL, POWDER COATED LN.FT 126 $44.00 $5,544.00
32 TANGENT GUIDE RAIL TERMINAL, 25' SECTION, POWDER COATED UNIT(S) 4 $4,150.00 $16,600.00
33 APPROACH GUIDE RAIL TRANSITION, TL-2, POWDER COATED UNIT(S) 4 $2,625.00 $10,500.00
34 30" X 30" SIGN UNIT(S) 2 $290.00 $580.00
35 18" X 24" SIGN UNIT(S) 5 $140.00 $700.00
36 TOPSOIL SPREADING, 5" THICK SQ.YD(S) 262 $4.20 $1,100.40
37 BORROW TOPSOIL CU.YD(S) 6 $73.50 $441.00
38 FERTILIZING AND SEEDING, TYPE 13 SQ.YD(S) 262 $1.60 $419.20
39 TOPSOIL STABILIZATION, TYPE 1 MAT SQ.YD(S) 110 $4.75 $522.50
40 STRAW MULCHING SQ.YD(S) 262 $1.60 $419.20
41 CLEARING SITE, BRIDGE MT-18 LS 1 $32,000.00 $32,000.00
42 COARSE AGGREGATE, SIZE NO. 57 CU.YD(S) 18 $300.00 $5,400.00
43 TEMPORARY COFFERDAM LS 1 $96,000.00 $96,000.00
44 PERMANENT COFFERDAM LS 1 $105,000.00 $105,000.00
45 CONCRETE FOOTING CU.YD(S) 16 $900.00 $14,400.00
46 CONCRETE WINGWALL CU.YD(S) 2 $3,115.00 $6,230.00
47 MEMBRANE WATERPROOFING SQ.YD(S) 79 $50.00 $3,950.00
48 STONE VENEER SQ.FT 1423 $45.00 $64,035.00
49 PRECAST CONCRETE ARCH STRUCTURE LS 1 $265,000.00 $265,000.00
50 BRIDGE IDENTIFICATION PLAQUE, 22" X 22" UNIT(S) 1 $3,080.00 $3,080.00
BRIDGE MT-19
51 BAR CHART PROGRESS SCHEDULE AND UPDATES LS 1 $1,575.00 $1,575.00
52 MOBILIZATION LS 1 $45,000.00 $45,000.00
53 MONUMENT UNIT(S) 3 $875.00 $2,625.00
54 SILT FENCE LN.FT 1808 $5.00 $9,040.00
55 INLET FILTER TYPE 2, 4' X 4' UNIT(S) 12 $343.00 $4,116.00
56 FLOATING TURBIDITY BARRIER, TYPE 1 LN.FT 21 $5.00 $105.00
57 CONCRETE WASHOUT SYSTEM LS 1 $6,050.00 $6,050.00
58 OIL ONLY EMERGENCY SPILL KIT, TYPE 1 UNIT(S) 2 $116.00 $232.00
59 BREAKAWAY BARRICADE UNIT(S) 16 $1.00 $16.00
60 DRUM UNIT(S) 25 $1.00 $25.00
61 TRAFFIC CONE UNIT(S) 50 $1.00 $50.00
62 CONSTRUCTION SIGNS SQ.FT 260 $18.00 $4,680.00
63 CONSTRUCTION BARRIER CURB LN.FT 60 $20.47 $1,228.20
64 PORTABLE VARIABLE MESSAGE SIGN UNIT(S) 2 $1,750.00 $3,500.00
65 CONSTRUCTION IDENTIFICATION SIGN, 6' X 4' UNIT(S) 2 $785.00 $1,570.00
66 UNIFORMED POLICE OFFICERS ALLOWANCE DOLLARS 10000 $1.00 $10,000.00
67 FUEL PRICE ADJUSTMENT DOLLARS 1000 $1.00 $1,000.00
68 ASPHALT PRICE ADJUSTMENT DOLLARS 1000 $1.00 $1,000.00
69 VIBRATION MONITORING LS 1 $7,875.00 $7,875.00
70 CLEARING SITE LS 1 $53,000.00 $53,000.00
71 EXCAVATION, TEST PIT UNIT(S) 8 $1,115.30 $8,922.40
72 EXCAVATION, UNCLASSIFIED CU.YD(S) 1784 $40.00 $71,360.00
73 DISPOSAL OF REGULATED MATERIALS AND ACID PRODUCING SOILS, ALLOWANCE DOLLARS 20000 $1.00 $20,000.00
74 MATERIAL SAMPLING AND ANALYSIS, REGULATED, ALLOWANCE DOLLARS 2000 $1.00 $2,000.00
75 I-9 SOIL AGGREGATE CU.YD(S) 160 $210.00 $33,600.00
76 CONTROLLED LOW STRENGTH MATERIAL CU.YD(S) 50 $191.01 $9,550.50
77 DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK SQ.YD(S) 2051 $20.00 $41,020.00
78 DENSE-GRADED AGGREGATE BASE COURSE, 8" THICK SQ.YD(S) 212 $32.00 $6,784.00
79 SURFACE GRAVEL, 4" THICK SQ.YD(S) 212 $36.00 $7,632.00
80 HMA MILLING, 3" OR LESS SQ.YD(S) 868 $12.00 $10,416.00
81 TACK COAT GAL(S) 294 $7.00 $2,058.00
82 HOT MIX ASPHALT 9.5M64 SURFACE COURSE TON(S) 405 $132.00 $53,460.00
83 HOT MIX ASPHALT 19M64 BASE COURSE TON(S) 740 $113.00 $83,620.00
84 18" REINFORCED CONCRETE PIPE LN.FT 282 $120.00 $33,840.00
85 30" REINFORCED CONCRETE PIPE LN.FT 156 $185.00 $28,860.00
86 INLET, TYPE B UNIT(S) 2 $5,850.00 $11,700.00
87 INLET, TYPE DOUBLE B UNIT(S) 4 $9,700.00 $38,800.00
88 INLET, TYPE DOUBLE E UNIT(S) 1 $8,700.00 $8,700.00
89 MANHOLE, 4' DIAMETER UNIT(S) 1 $7,000.00 $7,000.00
90 TEMPORARY CHAIN-LINK FENCE, 6' HIGH LN.FT 100 $20.00 $2,000.00
91 RESET FENCE LN.FT 546 $24.00 $13,104.00
92 RESET PRECAST STONE PAVERS SQ.YD(S) 33 $62.00 $2,046.00
93 RESET STONE RETAINING WALL LN.FT 20 $100.00 $2,000.00
94 HOT MIX ASPHALT DRIVEWAY, 4" THICK SQ.YD(S) 29 $83.00 $2,407.00
95 6" X 8" X 20" CONCRETE VERTICAL CURB LN.FT 1345 $37.00 $49,765.00
96 NON-VEGETATIVE SURFACE, POROUS HOT MIX ASPHALT, 4" THICK SQ.YD(S) 32 $167.00 $5,344.00
97 BEAM GUIDE RAIL, POWDER COATED LN.FT 106 $63.00 $6,678.00
98 TANGENT GUIDE RAIL TERMINAL, 25' SECTION, POWDER COATED UNIT(S) 2 $4,150.00 $8,300.00
99 BEAM GUIDE RAIL ANCHORAGE, POWDER COATED UNIT(S) 2 $2,000.00 $4,000.00
100 APPROACH GUIDE RAIL TRANSITION TL-2, POWDER COATED UNIT(S) 4 $2,625.00 $10,500.00
101 TRAFFIC STRIPES, 4" LN.FT 3251 $1.00 $3,251.00
102 TRAFFIC MARKING LINES, 24" LN.FT 16 $21.00 $336.00
103 30" X 30'' SIGN UNIT(S) 1 $290.00 $290.00
104 TOPSOIL SPREADING, 5" THICK SQ.YD(S) 512 $4.25 $2,176.00
105 BORROW TOPSOIL CU.YD(S) 73 $73.50 $5,365.50
106 FERTILIZING AND SEEDING, TYPE 13 SQ.YD(S) 512 $1.60 $819.20
107 TOPSOIL STABILIZATION, TYPE 1 MAT SQ.YD(S) 69 $4.75 $327.75
108 STRAW MULCHING SQ.YD(S) 512 $1.60 $819.20
109 CLEARING SITE, BRIDGE MT-19 LS 1 $40,000.00 $40,000.00
110 COARSE AGGREGATE, SIZE NO. 57 CU.YD(S) 77 $170.00 $13,090.00
111 TEMPORARY COFFERDAM LS 1 $52,500.00 $52,500.00
112 PERMANENT COFFERDAM LS 1 $71,500.00 $71,500.00
113 REINFORCEMENT STEEL, GALVANIZED LB(S) 4100 $3.00 $12,300.00
114 CONCRETE WINGWALL CU.YD(S) 5 $5,560.00 $27,800.00
115 MEMBRANE WATERPROOFING SQ.YD(S) 92 $46.00 $4,232.00
116 STONE VENEER SQ.FT 1636 $50.00 $81,800.00
117 PRECAST CONCRETE CULVERT LN.FT 41 $6,370.00 $261,170.00
118 PRECAST CONCRETE WINGWALL, (L-SHAPED) LN.FT 64 $2,000.00 $128,000.00
119 CONCRETE BRIDGE PARAPET LN.FT 89 $340.00 $30,260.00
120 BRIDGE IDENTIFICATION PLAQUE, 22" X 22" UNIT(S) 1 $3,080.00 $3,080.00
121 4" PVC UNDERDRAIN PIPE LN.FT 156 $85.00 $13,260.00
  • Posted By:
  • Monmouth County Purchasing
  • Hall of Records, 3rd Floor
  • 1 East Main St.
  • Freehold, NJ 07728
  • Phone: (732) 431-7370
  • Fax: (732) 431-7379
  • On behalf of:
  • Division of Engineering & Traffic Safety
  • Hall of Records Annex
  • 1 East Main Street
  • Freehold, NJ 07728

Contact: ENGINEERING DIVISION @ 732-431-7760