Monmouth County Purchasing Division
F-63-2024
REPLACEMENT OF BRIDGE MT-18 ON WHIPPORWILL VALLEY ROAD AND BRIDGE MT-19 ON CHAPEL HILL ROAD OVER MCCLEES CREEK IN THE TOWNSHIP OF MIDDLETOWN
Awarded:
7/11/2024
| Number | Item Description | Unit | Qty | Unit Price | Total |
|---|---|---|---|---|---|
|
RENCOR, INCORPORATED
(Total Awarded: $2,452,953.05)
908-534-2131 |
|||||
| BRIDGE MT-18 | |||||
| 1 | BAR CHART PROGRESS SCHEDULE AND UPDATES | LS | 1 | $1,600.00 | $1,600.00 |
| 2 | MOBILIZATION | LS | 1 | $45,000.00 | $45,000.00 |
| 3 | MONUMENT | UNIT(S) | 3 | $900.00 | $2,700.00 |
| 4 | SILT FENCE | LN.FT | 915 | $5.00 | $4,575.00 |
| 5 | INLET FILTER TYPE 2, 2' X 4' | UNIT(S) | 1 | $75.00 | $75.00 |
| 6 | FLOATING TURBIDITY BARRIER, TYPE 1 | LN.FT | 16 | $5.00 | $80.00 |
| 7 | CONCRETE WASHOUT SYSTEM | LS | 1 | $4,000.00 | $4,000.00 |
| 8 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | UNIT(S) | 2 | $120.00 | $240.00 |
| 9 | BREAKAWAY BARRICADE | UNIT(S) | 10 | $1.00 | $10.00 |
| 10 | DRUM | UNIT(S) | 15 | $1.00 | $15.00 |
| 11 | TRAFFIC CONE | UNIT(S) | 15 | $1.00 | $15.00 |
| 12 | CONSTRUCTION SIGNS | SQ.FT | 242 | $18.00 | $4,356.00 |
| 13 | CONSTRUCTION BARRIER CURB | LN.FT | 40 | $65.00 | $2,600.00 |
| 14 | PORTABLE VARIABLE MESSAGE SIGN | UNIT(S) | 2 | $1,750.00 | $3,500.00 |
| 15 | CONSTRUCTION IDENTIFICATION SIGN, 6' X 4' | UNIT(S) | 2 | $800.00 | $1,600.00 |
| 16 | UNIFORMED POLICE OFFICERS ALLOWANCE | DOLLARS | 10000 | $1.00 | $10,000.00 |
| 17 | FUEL PRICE ADJUSTMENT | DOLLARS | 1000 | $1.00 | $1,000.00 |
| 18 | ASPHALT PRICE ADJUSTMENT | DOLLARS | 1000 | $1.00 | $1,000.00 |
| 19 | VIBRATION MONITORING | LS | 1 | $7,500.00 | $7,500.00 |
| 20 | CLEARING SITE | LS | 1 | $40,000.00 | $40,000.00 |
| 21 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 840 | $65.00 | $54,600.00 |
| 22 | DISPOSAL OF REGULATED MATERIALS AND ACID PRODUCING SOILS. ALLOWANCE | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 23 | MATERIAL SAMPLING AND ANALYSES, REGULATED, ALLOWANCE | DOLLARS | 2000 | $1.00 | $2,000.00 |
| 24 | I-9 SOIL AGGREGATE | CU.YD(S) | 205 | $180.00 | $36,900.00 |
| 25 | CONTROLLED LOW STRENGTH MATERIAL | CU.YD(S) | 50 | $190.00 | $9,500.00 |
| 26 | DENSE-GRADED AGGREGATE BASE COURSE, 8" THICK | SQ.YD(S) | 1030 | $30.00 | $30,900.00 |
| 27 | SURFACE GRAVEL, 4" THICK | SQ.YD(S) | 1140 | $25.00 | $28,500.00 |
| 28 | RESET FENCE | LN.FT | 60 | $54.00 | $3,240.00 |
| 29 | HOT MIX ASPHALT DRIVEWAY, 4" THICK | SQ.YD(S) | 14 | $215.00 | $3,010.00 |
| 30 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 141 | $85.00 | $11,985.00 |
| 31 | BEAM GUIDE RAIL, POWDER COATED | LN.FT | 126 | $44.00 | $5,544.00 |
| 32 | TANGENT GUIDE RAIL TERMINAL, 25' SECTION, POWDER COATED | UNIT(S) | 4 | $4,150.00 | $16,600.00 |
| 33 | APPROACH GUIDE RAIL TRANSITION, TL-2, POWDER COATED | UNIT(S) | 4 | $2,625.00 | $10,500.00 |
| 34 | 30" X 30" SIGN | UNIT(S) | 2 | $290.00 | $580.00 |
| 35 | 18" X 24" SIGN | UNIT(S) | 5 | $140.00 | $700.00 |
| 36 | TOPSOIL SPREADING, 5" THICK | SQ.YD(S) | 262 | $4.20 | $1,100.40 |
| 37 | BORROW TOPSOIL | CU.YD(S) | 6 | $73.50 | $441.00 |
| 38 | FERTILIZING AND SEEDING, TYPE 13 | SQ.YD(S) | 262 | $1.60 | $419.20 |
| 39 | TOPSOIL STABILIZATION, TYPE 1 MAT | SQ.YD(S) | 110 | $4.75 | $522.50 |
| 40 | STRAW MULCHING | SQ.YD(S) | 262 | $1.60 | $419.20 |
| 41 | CLEARING SITE, BRIDGE MT-18 | LS | 1 | $32,000.00 | $32,000.00 |
| 42 | COARSE AGGREGATE, SIZE NO. 57 | CU.YD(S) | 18 | $300.00 | $5,400.00 |
| 43 | TEMPORARY COFFERDAM | LS | 1 | $96,000.00 | $96,000.00 |
| 44 | PERMANENT COFFERDAM | LS | 1 | $105,000.00 | $105,000.00 |
| 45 | CONCRETE FOOTING | CU.YD(S) | 16 | $900.00 | $14,400.00 |
| 46 | CONCRETE WINGWALL | CU.YD(S) | 2 | $3,115.00 | $6,230.00 |
| 47 | MEMBRANE WATERPROOFING | SQ.YD(S) | 79 | $50.00 | $3,950.00 |
| 48 | STONE VENEER | SQ.FT | 1423 | $45.00 | $64,035.00 |
| 49 | PRECAST CONCRETE ARCH STRUCTURE | LS | 1 | $265,000.00 | $265,000.00 |
| 50 | BRIDGE IDENTIFICATION PLAQUE, 22" X 22" | UNIT(S) | 1 | $3,080.00 | $3,080.00 |
| BRIDGE MT-19 | |||||
| 51 | BAR CHART PROGRESS SCHEDULE AND UPDATES | LS | 1 | $1,575.00 | $1,575.00 |
| 52 | MOBILIZATION | LS | 1 | $45,000.00 | $45,000.00 |
| 53 | MONUMENT | UNIT(S) | 3 | $875.00 | $2,625.00 |
| 54 | SILT FENCE | LN.FT | 1808 | $5.00 | $9,040.00 |
| 55 | INLET FILTER TYPE 2, 4' X 4' | UNIT(S) | 12 | $343.00 | $4,116.00 |
| 56 | FLOATING TURBIDITY BARRIER, TYPE 1 | LN.FT | 21 | $5.00 | $105.00 |
| 57 | CONCRETE WASHOUT SYSTEM | LS | 1 | $6,050.00 | $6,050.00 |
| 58 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | UNIT(S) | 2 | $116.00 | $232.00 |
| 59 | BREAKAWAY BARRICADE | UNIT(S) | 16 | $1.00 | $16.00 |
| 60 | DRUM | UNIT(S) | 25 | $1.00 | $25.00 |
| 61 | TRAFFIC CONE | UNIT(S) | 50 | $1.00 | $50.00 |
| 62 | CONSTRUCTION SIGNS | SQ.FT | 260 | $18.00 | $4,680.00 |
| 63 | CONSTRUCTION BARRIER CURB | LN.FT | 60 | $20.47 | $1,228.20 |
| 64 | PORTABLE VARIABLE MESSAGE SIGN | UNIT(S) | 2 | $1,750.00 | $3,500.00 |
| 65 | CONSTRUCTION IDENTIFICATION SIGN, 6' X 4' | UNIT(S) | 2 | $785.00 | $1,570.00 |
| 66 | UNIFORMED POLICE OFFICERS ALLOWANCE | DOLLARS | 10000 | $1.00 | $10,000.00 |
| 67 | FUEL PRICE ADJUSTMENT | DOLLARS | 1000 | $1.00 | $1,000.00 |
| 68 | ASPHALT PRICE ADJUSTMENT | DOLLARS | 1000 | $1.00 | $1,000.00 |
| 69 | VIBRATION MONITORING | LS | 1 | $7,875.00 | $7,875.00 |
| 70 | CLEARING SITE | LS | 1 | $53,000.00 | $53,000.00 |
| 71 | EXCAVATION, TEST PIT | UNIT(S) | 8 | $1,115.30 | $8,922.40 |
| 72 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 1784 | $40.00 | $71,360.00 |
| 73 | DISPOSAL OF REGULATED MATERIALS AND ACID PRODUCING SOILS, ALLOWANCE | DOLLARS | 20000 | $1.00 | $20,000.00 |
| 74 | MATERIAL SAMPLING AND ANALYSIS, REGULATED, ALLOWANCE | DOLLARS | 2000 | $1.00 | $2,000.00 |
| 75 | I-9 SOIL AGGREGATE | CU.YD(S) | 160 | $210.00 | $33,600.00 |
| 76 | CONTROLLED LOW STRENGTH MATERIAL | CU.YD(S) | 50 | $191.01 | $9,550.50 |
| 77 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 2051 | $20.00 | $41,020.00 |
| 78 | DENSE-GRADED AGGREGATE BASE COURSE, 8" THICK | SQ.YD(S) | 212 | $32.00 | $6,784.00 |
| 79 | SURFACE GRAVEL, 4" THICK | SQ.YD(S) | 212 | $36.00 | $7,632.00 |
| 80 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 868 | $12.00 | $10,416.00 |
| 81 | TACK COAT | GAL(S) | 294 | $7.00 | $2,058.00 |
| 82 | HOT MIX ASPHALT 9.5M64 SURFACE COURSE | TON(S) | 405 | $132.00 | $53,460.00 |
| 83 | HOT MIX ASPHALT 19M64 BASE COURSE | TON(S) | 740 | $113.00 | $83,620.00 |
| 84 | 18" REINFORCED CONCRETE PIPE | LN.FT | 282 | $120.00 | $33,840.00 |
| 85 | 30" REINFORCED CONCRETE PIPE | LN.FT | 156 | $185.00 | $28,860.00 |
| 86 | INLET, TYPE B | UNIT(S) | 2 | $5,850.00 | $11,700.00 |
| 87 | INLET, TYPE DOUBLE B | UNIT(S) | 4 | $9,700.00 | $38,800.00 |
| 88 | INLET, TYPE DOUBLE E | UNIT(S) | 1 | $8,700.00 | $8,700.00 |
| 89 | MANHOLE, 4' DIAMETER | UNIT(S) | 1 | $7,000.00 | $7,000.00 |
| 90 | TEMPORARY CHAIN-LINK FENCE, 6' HIGH | LN.FT | 100 | $20.00 | $2,000.00 |
| 91 | RESET FENCE | LN.FT | 546 | $24.00 | $13,104.00 |
| 92 | RESET PRECAST STONE PAVERS | SQ.YD(S) | 33 | $62.00 | $2,046.00 |
| 93 | RESET STONE RETAINING WALL | LN.FT | 20 | $100.00 | $2,000.00 |
| 94 | HOT MIX ASPHALT DRIVEWAY, 4" THICK | SQ.YD(S) | 29 | $83.00 | $2,407.00 |
| 95 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 1345 | $37.00 | $49,765.00 |
| 96 | NON-VEGETATIVE SURFACE, POROUS HOT MIX ASPHALT, 4" THICK | SQ.YD(S) | 32 | $167.00 | $5,344.00 |
| 97 | BEAM GUIDE RAIL, POWDER COATED | LN.FT | 106 | $63.00 | $6,678.00 |
| 98 | TANGENT GUIDE RAIL TERMINAL, 25' SECTION, POWDER COATED | UNIT(S) | 2 | $4,150.00 | $8,300.00 |
| 99 | BEAM GUIDE RAIL ANCHORAGE, POWDER COATED | UNIT(S) | 2 | $2,000.00 | $4,000.00 |
| 100 | APPROACH GUIDE RAIL TRANSITION TL-2, POWDER COATED | UNIT(S) | 4 | $2,625.00 | $10,500.00 |
| 101 | TRAFFIC STRIPES, 4" | LN.FT | 3251 | $1.00 | $3,251.00 |
| 102 | TRAFFIC MARKING LINES, 24" | LN.FT | 16 | $21.00 | $336.00 |
| 103 | 30" X 30'' SIGN | UNIT(S) | 1 | $290.00 | $290.00 |
| 104 | TOPSOIL SPREADING, 5" THICK | SQ.YD(S) | 512 | $4.25 | $2,176.00 |
| 105 | BORROW TOPSOIL | CU.YD(S) | 73 | $73.50 | $5,365.50 |
| 106 | FERTILIZING AND SEEDING, TYPE 13 | SQ.YD(S) | 512 | $1.60 | $819.20 |
| 107 | TOPSOIL STABILIZATION, TYPE 1 MAT | SQ.YD(S) | 69 | $4.75 | $327.75 |
| 108 | STRAW MULCHING | SQ.YD(S) | 512 | $1.60 | $819.20 |
| 109 | CLEARING SITE, BRIDGE MT-19 | LS | 1 | $40,000.00 | $40,000.00 |
| 110 | COARSE AGGREGATE, SIZE NO. 57 | CU.YD(S) | 77 | $170.00 | $13,090.00 |
| 111 | TEMPORARY COFFERDAM | LS | 1 | $52,500.00 | $52,500.00 |
| 112 | PERMANENT COFFERDAM | LS | 1 | $71,500.00 | $71,500.00 |
| 113 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 4100 | $3.00 | $12,300.00 |
| 114 | CONCRETE WINGWALL | CU.YD(S) | 5 | $5,560.00 | $27,800.00 |
| 115 | MEMBRANE WATERPROOFING | SQ.YD(S) | 92 | $46.00 | $4,232.00 |
| 116 | STONE VENEER | SQ.FT | 1636 | $50.00 | $81,800.00 |
| 117 | PRECAST CONCRETE CULVERT | LN.FT | 41 | $6,370.00 | $261,170.00 |
| 118 | PRECAST CONCRETE WINGWALL, (L-SHAPED) | LN.FT | 64 | $2,000.00 | $128,000.00 |
| 119 | CONCRETE BRIDGE PARAPET | LN.FT | 89 | $340.00 | $30,260.00 |
| 120 | BRIDGE IDENTIFICATION PLAQUE, 22" X 22" | UNIT(S) | 1 | $3,080.00 | $3,080.00 |
| 121 | 4" PVC UNDERDRAIN PIPE | LN.FT | 156 | $85.00 | $13,260.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760