Monmouth County Purchasing Division
F-67-2024
2024/2025 ON-CALL MAINTENANCE CONTRACT FOR ROADWAYS AND BRIDGES, VARIOUS LOCATIONS, IN THE COUNTY OF MONMOUTH FOR THE ESTIMATED TIME PERIOD OF AUGUST 1, 2024 THROUGH JULY 31, 2025
Number | Item Description | Unit | Qty | Unit Price | Total |
---|---|---|---|---|---|
SPARWICK CONTRACTING INC.
(Total Awarded: $1,293,357.01)
973-300-4709 |
|||||
TIME AND MATERIAL | |||||
1 | PERFORMANCE BOND AND PAYMENT BOND | LS | 1 | $0.01 | $0.01 |
2 | OWNER’S & CONTRACTOR’S PROTECTIVE LIABILITY INSURANCE | LS | 1 | $0.01 | $0.01 |
3 | TRAFFIC DIRECTORS | HOUR(S) | 8 | $0.01 | $0.08 |
4 | UNIFORMED POLICE OFFICER ALLOWANCE | UNIT(S) | 10000 | $1.00 | $10,000.00 |
5 | BREAKAWAY BARRICADES | UNIT(S) | 5 | $0.01 | $0.05 |
6 | TRAFFIC CONES | UNIT(S) | 30 | $0.01 | $0.30 |
7 | DRUMS | UNIT(S) | 8 | $0.01 | $0.08 |
8 | CONSTRUCTION SIGNS, 48” X 48” | UNIT(S) | 4 | $0.01 | $0.04 |
9 | CONSTRUCTION SIGNS, 60” X 30” | UNIT(S) | 4 | $0.01 | $0.04 |
10 | CONSTRUCTION SIGNS, 48” X 24” | UNIT(S) | 4 | $0.01 | $0.04 |
11 | CONSTRUCTION SIGNS, 48” X 30” | UNIT(S) | 4 | $0.01 | $0.04 |
12 | FLOODLIGHTS FOR NIGHTTIME OPERATIONS | DAY(S) | 4 | $0.01 | $0.04 |
13 | ILLUMINATED FLASHING ARROWS, 4’ X 8’ | DAY(S) | 3 | $0.01 | $0.03 |
14 | TRUCK MOUNTED ATTENUATOR REPLACEMENT CARTRIDGE | UNIT(S) | 1 | $0.01 | $0.01 |
15 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHIONS | DAY(S) | 3 | $0.01 | $0.03 |
16 | MOBILIZATION OF TRAFFIC CONTROL | DAY(S) | 5 | $0.01 | $0.05 |
17 | MATERIALS ALLOWANCE | UNIT(S) | 125000 | $1.00 | $125,000.00 |
18 | SPECIALTY SERVICES AND EQUIPMENT ALLOWANCE | UNIT(S) | 50000 | $1.00 | $50,000.00 |
19 | MOBILIZATION OF LAND BASED PILE DRIVER-STD | HOUR(S) | 4 | $100.00 | $400.00 |
20 | MOBILIZATION OF LAND BASED PILE DRIVER-PREM | HOUR(S) | 2 | $100.00 | $200.00 |
21 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES – STD | HOUR(S) | 8 | $140.00 | $1,120.00 |
22 | MOBILIZATION OF BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 4 | $140.00 | $560.00 |
23 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – STD | HOUR(S) | 8 | $0.01 | $0.08 |
24 | MOBILIZATION OF WORKING BARGE, SELF-PROPELLED – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
25 | DIVER – STD | HOUR(S) | 16 | $810.00 | $12,960.00 |
26 | DIVER – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
27 | PE DIVER- STD | HOUR(S) | 8 | $835.00 | $6,680.00 |
28 | PE DIVER- PREM | HOUR(S) | 4 | $0.01 | $0.04 |
29 | SHOP PREPARATION – STD | HOUR(S) | 16 | $0.01 | $0.16 |
30 | SHOP PREPARATION – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
31 | SHOP FABRICATION – STD | HOUR(S) | 16 | $0.01 | $0.16 |
32 | SHOP FABRICATION – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
33 | TIMBER WORK – STD | HOUR(S) | 200 | $155.00 | $31,000.00 |
34 | TIMBER WORK – PREM | HOUR(S) | 50 | $60.00 | $3,000.00 |
35 | CONCRETE WORK – STD | HOUR(S) | 500 | $155.00 | $77,500.00 |
36 | CONCRETE WORK – PREM | HOUR(S) | 50 | $60.00 | $3,000.00 |
37 | STEEL WORK – STD | HOUR(S) | 125 | $155.00 | $19,375.00 |
38 | STEEL WORK – PREM | HOUR(S) | 50 | $60.00 | $3,000.00 |
39 | LABORER – STD | HOUR(S) | 800 | $155.00 | $124,000.00 |
40 | LABORER – PREM | HOUR(S) | 50 | $60.00 | $3,000.00 |
41 | 6” X 8” X 20” CONCRETE VERTICAL CURB | LN.FT | 100 | $25.00 | $2,500.00 |
42 | CONCRETE SIDEWALK, 4” THICK | SQ.YD(S) | 100 | $45.00 | $4,500.00 |
43 | CONCRETE DRIVEWAY, REINFORCED, 6” THICK | SQ.YD(S) | 80 | $55.00 | $4,400.00 |
44 | DETECTABLE WARNING SURFACE | SQ.YD(S) | 10 | $150.00 | $1,500.00 |
45 | REPAIR OF CONCRETE DECK, TYPE A | SQ.FT | 350 | $0.01 | $3.50 |
46 | REPAIR OF CONCRETE DECK, TYPE B | SQ.FT | 350 | $0.01 | $3.50 |
47 | REPAIR OF CONCRETE DECK, TYPE C | SQ.FT | 80 | $0.01 | $0.80 |
48 | TRAVEL – STD | HOUR(S) | 40 | $0.01 | $0.40 |
49 | TRAVEL – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
50 | ACCESS WORK BOAT | HOUR(S) | 40 | $100.00 | $4,000.00 |
51 | MANPOWER ACCESS MACHINE, SELF-PROPELLED | HOUR(S) | 8 | $0.01 | $0.08 |
52 | WORKING BARGE, SELF-PROPELLED – STD | HOUR(S) | 8 | $0.01 | $0.08 |
53 | WORKING BARGE, SELF-PROPELLED – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
54 | AIR COMPRESSOR (150-225CFM) | HOUR(S) | 80 | $100.00 | $8,000.00 |
55 | FLOATING WORK PLATFORM | HOUR(S) | 24 | $100.00 | $2,400.00 |
56 | WATER BLAST CLEANING UNIT | HOUR(S) | 12 | $100.00 | $1,200.00 |
57 | PORTABLE CORE DRILL | HOUR(S) | 8 | $0.01 | $0.08 |
58 | JACKING SYSTEM, 100 TON | HOUR(S) | 8 | $0.01 | $0.08 |
59 | JACKING SYSTEM, (PAN CAKE), 100 TON | HOUR(S) | 4 | $0.01 | $0.04 |
60 | JACKING SYSTEM, 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
61 | JACKING SYSTEM, (PAN CAKE), 50 TON | HOUR(S) | 8 | $0.01 | $0.08 |
62 | MECHANICAL MORTAR/GROUT MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
63 | MECHANICAL CONCRETE MIXER | HOUR(S) | 8 | $50.00 | $400.00 |
64 | BLAST CLEANING UNIT | HOUR(S) | 12 | $50.00 | $600.00 |
65 | WALK BEHIND CONCRETE SAW | HOUR(S) | 4 | $50.00 | $200.00 |
66 | DEWATERING | HOUR(S) | 40 | $0.01 | $0.40 |
67 | DELAMINATION SURVEY | HOUR(S) | 4 | $0.01 | $0.04 |
68 | PNEUMATICALLY APPLIED MORTAR SYSTEM | HOUR(S) | 4 | $0.01 | $0.04 |
69 | MUD JACKING SYSTEM | HOUR(S) | 8 | $0.01 | $0.08 |
70 | PICKUP TRUCK, 4 X 2, GAS POWERED, STD | HOUR(S) | 200 | $100.00 | $20,000.00 |
71 | PICKUP TRUCK, 4 X 2, GAS POWERED, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
72 | STAKE BODY TRUCK – STD | HOUR(S) | 200 | $100.00 | $20,000.00 |
73 | STAKE BODY TRUCK – PREM | HOUR(S) | 4 | $0.01 | $0.04 |
74 | TRUCK MOUNTED CRANE – STD | HOUR(S) | 24 | $500.00 | $12,000.00 |
75 | TRUCK MOUNTED CRANE – PREM | HOUR(S) | 4 | $500.00 | $2,000.00 |
76 | EXCAVATOR -STD | HOUR(S) | 250 | $200.00 | $50,000.00 |
77 | EXCAVATOR -PREM | HOUR(S) | 8 | $150.00 | $1,200.00 |
78 | LOADER - STD | HOUR(S) | 80 | $150.00 | $12,000.00 |
79 | LOADER - PREM | HOUR(S) | 4 | $150.00 | $600.00 |
80 | TELESCOPIC FORKLIFT - STD | HOUR(S) | 24 | $0.01 | $0.24 |
81 | TELESCOPIC FORKLIFT - PREM | HOUR(S) | 4 | $0.01 | $0.04 |
82 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, STD | HOUR(S) | 8 | $50.00 | $400.00 |
83 | MANPOWER ACCESS MACHINE, TRUCK MOUNTED, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
84 | DUMP TRUCK, 10 CY – STD | HOUR(S) | 100 | $100.00 | $10,000.00 |
85 | DUMP TRUCK, 10 CY – PREM | HOUR(S) | 4 | $100.00 | $400.00 |
86 | TANDEM DUMP TRUCK, 16 CY – STD | HOUR(S) | 100 | $100.00 | $10,000.00 |
87 | TANDEM DUMP TRUCK, 16 CY – PREM | HOUR(S) | 4 | $100.00 | $400.00 |
88 | LAND BASED PILE DRIVER - STD | HOUR(S) | 20 | $500.00 | $10,000.00 |
89 | LAND BASED PILE DRIVER – PREM | HOUR(S) | 4 | $500.00 | $2,000.00 |
90 | BARGE BASED PILE DRIVER, 60 FOOT PILES, STD | HOUR(S) | 8 | $500.00 | $4,000.00 |
91 | BARGE BASED PILE DRIVER, 60 FOOT PILES, PREM | HOUR(S) | 2 | $500.00 | $1,000.00 |
92 | COMBINATION LOADER/BACKHOE, STD | HOUR(S) | 75 | $0.01 | $0.75 |
93 | COMBINATION LOADER/BACKHOE, PREM | HOUR(S) | 4 | $0.01 | $0.04 |
94 | CONCRETE PUMP, STD | HOUR(S) | 8 | $125.00 | $1,000.00 |
95 | CONCRETE PUMP, PREM | HOUR(S) | 4 | $125.00 | $500.00 |
96 | SNOOPER, ON-CALL DAILY | DAY(S) | 1 | $5,500.00 | $5,500.00 |
97 | SNOOPER, ON-CALL WEEKLY | WEEK(S) | 1 | $0.01 | $0.01 |
SITE 1: BRIDGE W-7 | |||||
98 | 16" DIAMETER TIMBER PILE JACKET AND GROUT - FURNISHED | LN.FT | 132 | $219.00 | $28,908.00 |
99 | 16" DIAMETER TIMBER PILE JACKET AND GROUT - INSTALLED | LN.FT | 120 | $1,650.00 | $198,000.00 |
100 | 4"X12" TIMBER, CROSS BRACING -FURNISHED | LN.FT | 120 | $40.00 | $4,800.00 |
101 | 4"X12" TIMBER, CROSS BRACING - INSTALLED | LN.FT | 60 | $615.00 | $36,900.00 |
SITE 2: DUTCH LANE DRAINAGE IMPROVEMENTS | |||||
102 | MAINTENACE AND PROTECTION OF TRAFFIC, DUTCH LANE | LS | 1 | $65,000.00 | $65,000.00 |
103 | UNIFORMED POLICE OFFICER ALLOWANCE, DUTCH LANE | UNIT(S) | 20000 | $1.00 | $20,000.00 |
104 | CLEARING SITE, DUTCH LANE | LS | 1 | $60,000.00 | $60,000.00 |
105 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 742 | $30.00 | $22,260.00 |
106 | GEOTEXTILE | SQ.YD(S) | 1052 | $1.50 | $1,578.00 |
107 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 315 | $15.00 | $4,725.00 |
108 | COARSE AGGREGATE, SIZE NO. 57 | CU.YD(S) | 171 | $100.00 | $17,100.00 |
109 | TACK COAT | GAL(S) | 27 | $1.00 | $27.00 |
110 | PRIME COAT | GAL(S) | 27 | $1.00 | $27.00 |
111 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 40 | $235.00 | $9,400.00 |
112 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 115 | $235.00 | $27,025.00 |
113 | 15" REINFORCED CONCRETE PIPE | LN.FT | 273 | $70.00 | $19,110.00 |
114 | 12" PERFORATED HIGH DENSITY POLYETHYLENE PIPE | LN.FT | 856 | $20.00 | $17,120.00 |
115 | INLET, TYPE A | UNIT(S) | 8 | $4,200.00 | $33,600.00 |
116 | INLET, TYPE B | UNIT(S) | 1 | $5,000.00 | $5,000.00 |
117 | INLET, TYPE E | UNIT(S) | 1 | $5,000.00 | $5,000.00 |
118 | RECONSTRUCTED INLET, TYPE B, USING EXISTING CASTING | UNIT(S) | 2 | $2,000.00 | $4,000.00 |
119 | CURB PIECE | UNIT(S) | 3 | $450.00 | $1,350.00 |
120 | CONCRETE ISLAND, 4" THICK | SQ.YD(S) | 16 | $200.00 | $3,200.00 |
121 | 12" X 13" CONCRETE SLOPING CURB | LN.FT | 60 | $85.00 | $5,100.00 |
122 | BELGIAN BLOCK CURB | LN.FT | 97 | $60.00 | $5,820.00 |
123 | REMOVAL OF TRAFFIC STRIPES | LN.FT | 341 | $8.00 | $2,728.00 |
124 | TRAFFIC STRIPES, LONG LIFE THERMOPLASTIC 4" | LN.FT | 693 | $4.00 | $2,772.00 |
125 | TRAFFIC MARKING SYMBOLS | SQ.FT | 63 | $40.00 | $2,520.00 |
126 | REGULATORY AND WARNING SIGN | SQ.FT | 45 | $45.00 | $2,025.00 |
127 | SOLAR POWERED BEACON ASSEMBLY | UNIT(S) | 2 | $1,500.00 | $3,000.00 |
128 | BORROW TOPSOIL | CU.YD(S) | 181 | $65.00 | $11,765.00 |
129 | FERTILIZING AND SEEDING, TYPE 13 | SQ.YD(S) | 959 | $3.00 | $2,877.00 |
130 | EROSION CONTROL MATTING, TYPE 1 | SQ.YD(S) | 959 | $6.00 | $5,754.00 |
131 | STRAW MULCHING | SQ.YD(S) | 959 | $1.00 | $959.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering & Traffic Safety
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760
Delivery Date: 8/1/2024 - 7/31/2025