Monmouth County Purchasing Division
F-71-2024
Click here to download the project's Specification, Clarifications, Addenda, ect.PHASE IV LANDFILL EXPANSION VALLEY FILL AT THE MONMOUTH COUNTY RECLAMATION CENTER
Awarded:
9/12/2024
Number | Item Description | Unit | Qty | Unit Price | Total |
---|---|---|---|---|---|
C. ABBONIZIO CONTRACTORS INC.
(Total Awarded: $15,841,621.00)
856-228-2600 |
|||||
1 | MOBILIZATION/DEMOBILIZATION | LS | 1 | $377,000.00 | $377,000.00 |
2 | GENERAL CONDITIONS | LS | 1 | $500,000.00 | $500,000.00 |
3 | CONSTRUCTION SURVEY AND STAKE OUT | LS | 1 | $180,000.00 | $180,000.00 |
4 | SOIL EROSION AND SEDIMENT CONTROL | LS | 1 | $37,000.00 | $37,000.00 |
5 | SITE CLEARING AND INFRASTRUCTURE REMOVAL/ABANDONMENT | LS | 1 | $425,000.00 | $425,000.00 |
6 | SLIPLINE EXISTING PHASE 2 LEACHATE SYSTEM | LS | 1 | $200,000.00 | $200,000.00 |
7 | PHASE 2 TEMPORARY LEACHATE CONTROLS | LS | 1 | $185,000.00 | $185,000.00 |
8 | STRIP AND STOCKPILE TOPSOIL | SQ.YD(S) | 90400 | $3.00 | $271,200.00 |
9 | EXCAVATION TO STOCKPILE (COMMON EARTH) | CU.YD(S) | 13800 | $12.00 | $165,600.00 |
10 | SECTION 1A BASE LINER AND WEST PERIMETER BERM EARTHWORK | CU.YD(S) | 124000 | $12.00 | $1,488,000.00 |
11 | SUBGRADE-FINE GRADING | SQ.YD(S) | 841700 | $0.13 | $109,421.00 |
12 | SECONDARY GEOSYNTHETIC CLAY LINER | SQ.FT | 428400 | $1.00 | $428,400.00 |
13 | SECONDARY CONTAINMENT 60 MIL TEXTURED HDPE GEOMEMBRANE | SQ.FT | 428400 | $1.30 | $556,920.00 |
14 | SECONDARY GEOCOMPOSITE DRAINAGE LAYER | SQ.FT | 428400 | $1.20 | $514,080.00 |
15 | PRIMARY GEOSYNTHETIC CLAY LINER | SQ.FT | 841700 | $1.10 | $925,870.00 |
16 | PRIMARY CONTAINMENT 80 MIL TEXTURED HDPE GEOMEMBRANE | SQ.FT | 841700 | $1.20 | $1,010,040.00 |
17 | PRIMARY GEOCOMPOSITE DRAINAGE LAYER | SQ.FT | 841700 | $1.00 | $841,700.00 |
18 | CELL DIVIDER BERM | LS | 1 | $133,000.00 | $133,000.00 |
19 | SECTION 1A OPERATIONAL BERM AND ANCHOR AREA BACKFILL | LS | 1 | $325,000.00 | $325,000.00 |
20 | RAIN FLAP | LS | 1 | $15,000.00 | $15,000.00 |
21 | PRIMARY LEACHATE COLLECTION SYSTEM TRENCH AND PIPING | LN.FT | 3100 | $75.00 | $232,500.00 |
22 | SECONDARY LEACHATE COLLECTION SYSTEM TRENCH AND PIPING | LN.FT | 1900 | $57.00 | $108,300.00 |
23 | PRIMARY SAND BLANKET DRAIN | SQ.FT | 841700 | $3.20 | $2,693,440.00 |
24 | LEACHATE CLEANOUT RISERS | EACH | 4 | $5,000.00 | $20,000.00 |
25 | LEACHATE PUMP HOUSE NO. 2R | LS | 1 | $550,000.00 | $550,000.00 |
26 | LEACHATE FORCEMAIN | LN.FT | 2800 | $45.00 | $126,000.00 |
27 | RIP RAP CULVERT OUTLET AND SWALE PROTECTION | SQ.YD(S) | 2100 | $80.00 | $168,000.00 |
28 | STORMWATER DRAINAGE CULVERT-CORRUGATED HDPE (24-INCH) | LN.FT | 130 | $245.00 | $31,850.00 |
29 | STORMWATER DRAINAGE CULVERT-CORRUGATED HDPE (36-INCH) | LN.FT | 1200 | $170.00 | $204,000.00 |
30 | PRE-CAST CONCRETE CATCH BASIN | EACH | 2 | $19,000.00 | $38,000.00 |
31 | TEMPORARY GRASS LINED DIVERSION SWALE | LN.FT | 1800 | $75.00 | $135,000.00 |
32 | DOWNCHUTES | LN.FT | 300 | $540.00 | $162,000.00 |
33 | PHASE IV TOE GAS COLLECTOR | LN.FT | 600 | $45.00 | $27,000.00 |
34 | WATER UTILITY LINE | LN.FT | 300 | $180.00 | $54,000.00 |
35 | ELECTRICAL (WIRING AND CONTROLS) | LS | 1 | $444,000.00 | $444,000.00 |
36 | ELECTRICAL TRENCHES, CONDUITS, BACKFILL, AND CONNECTIONS | LS | 1 | $160,000.00 | $160,000.00 |
37 | LANDFILL GAS 24" HEADER PIPE, 2" AIR AND 4" FM AND APPURTENANCES | LN.FT | 400 | $175.00 | $70,000.00 |
38 | SALVAGE AND ABANDON EXISTING LANDFILL GAS HEADER CONDENSATE SUMP | LS | 1 | $16,500.00 | $16,500.00 |
39 | NEW LANDFILL GAS HEADER CONDENSATE SUMP | LS | 1 | $90,000.00 | $90,000.00 |
40 | RELOCATE 18" LANDFILL GAS HEADER | LS | 1 | $80,000.00 | $80,000.00 |
41 | LANDFILL GAS 6" LATERAL PIPES | LN.FT | 1300 | $68.00 | $88,400.00 |
42 | 6" LANDFILL GAS ISOLATION VALVE | EACH | 1 | $5,500.00 | $5,500.00 |
43 | RELOCATED REMOTE WELL HEADS | EACH | 5 | $760.00 | $3,800.00 |
44 | NEW LANDFILL GAS WELL HEADS | EACH | 3 | $1,580.00 | $4,740.00 |
45 | LANDFILL GAS PIPE ROAD CROSSING | EACH | 2 | $5,330.00 | $10,660.00 |
46 | STONE CONSTRUCTION PADS FOR FUTURE CAISSON WELLS | EACH | 19 | $2,800.00 | $53,200.00 |
47 | PAVED PERIMETER ACCESS ROAD AND GUIDE RAIL | LN.FT | 1000 | $224.00 | $224,000.00 |
48 | TOPSOIL AND SEED/SITE RESTORATION | SQ.YD(S) | 10000 | $8.00 | $80,000.00 |
49 | CONDENSATE LOADOUT AREA | LS | 1 | $165,000.00 | $165,000.00 |
50 | PHASE II TOE-DRAIN RESTORATION | LN.FT | 1600 | $148.00 | $236,800.00 |
51 | LANDFILL GAS 4" LATERAL PIPE | LN.FT | 110 | $20.00 | $2,200.00 |
52 | STORMWATER BASIN NO. 4 DEWATERING AND DREDGING | CU.YD(S) | 23000 | $30.00 | $690,000.00 |
53 | TEMPORARY EAST PERIMETER DITCH | LN.FT | 900 | $65.00 | $58,500.00 |
54 | A1 ALTERNATE BID NO. 1: MILLING AND PAVING OF 20FT WIDE PHASE 2 PERIMETER ROADWAY | LN.FT | 1600 | $75.00 | $120,000.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Reclamation Center
- Att: Anthony Morrell
- 6000 Asbury Avenue
- Tinton Falls, NJ 07753
Contact: SOPHIA GIEZEY 732-431-7370 X7381