Number | Item Description | Unit | Qty | Unit Price | Total |
---|---|---|---|---|---|
RENCOR, INCORPORATED
(Total Awarded: $8,492,028.70)
908-534-2131 |
|||||
1 | PROGRESS SCHEDULE | LS | 1 | $3,000.00 | $3,000.00 |
2 | PROGRESS SCHEDULE UPDATE | UNIT(S) | 4 | $575.00 | $2,300.00 |
3 | MOBILIZATION | LS | 1 | $90,000.00 | $90,000.00 |
4 | HEAVY-DUTY SILT FENCE, ORANGE | LN.FT | 2325 | $7.00 | $16,275.00 |
5 | INLET FILTER, TYPE 1 | SQ.FT | 32 | $100.00 | $3,200.00 |
6 | FLOATING TURBIDITY BARRIER, TYPE 2 | LN.FT | 105 | $1.00 | $105.00 |
7 | CONSTRUCTION DRIVEWAY (IF & WHERE DIRECTED) | CU.YD(S) | 30 | $200.00 | $6,000.00 |
8 | DEWATERING BASIN | UNIT(S) | 1 | $40,000.00 | $40,000.00 |
9 | SEDIMENT CONTROL BAG | SQ.FT | 500 | $12.00 | $6,000.00 |
10 | CONCRETE WASHOUT SYSTEM | LS | 1 | $20,000.00 | $20,000.00 |
11 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | LS | 1 | $1,165.00 | $1,165.00 |
12 | BREAKAWAY BARRICADE | UNIT(S) | 20 | $1.00 | $20.00 |
13 | DRUM | UNIT(S) | 100 | $1.00 | $100.00 |
14 | TRAFFIC CONE | UNIT(S) | 100 | $1.00 | $100.00 |
15 | CONSTRUCTION SIGNS | SQ.FT | 600 | $18.00 | $10,800.00 |
16 | CONSTRUCTION BARRIER CURB | LN.FT | 1600 | $75.00 | $120,000.00 |
17 | ARROW BOARD, 4' X 8' | UNIT(S) | 2 | $500.00 | $1,000.00 |
18 | PORTABLE VARIABLE MESSAGE SIGN | UNIT(S) | 2 | $1,500.00 | $3,000.00 |
19 | TEMPORARY CRASH CUSHION, INERTIAL BARRIER SYSTEM, 9 MODULES | UNIT(S) | 3 | $5,000.00 | $15,000.00 |
20 | TRAFFIC CONTROL TRUCK WITH MOUNTED CRASH CUSHION | UNIT(S) | 2 | $5,000.00 | $10,000.00 |
21 | TEMPORARY PAVEMENT MARKERS | UNIT(S) | 70 | $5.50 | $385.00 |
22 | HMA PATCH | TON(S) | 50 | $1.00 | $50.00 |
23 | TRAFFIC DIRECTOR, FLAGGER | HOUR(S) | 480 | $145.00 | $69,600.00 |
24 | TEMPORARY CRASH CUSHION, COMPRESSIVE BARRIER, TYPE 2, WIDTH NARROW | UNIT(S) | 1 | $10,000.00 | $10,000.00 |
25 | TRAFFIC STRIPES, LATEX, 4" | LN.FT | 5000 | $0.65 | $3,250.00 |
26 | MONMOUTH COUNTY PROJECT SIGN | UNIT(S) | 2 | $1,500.00 | $3,000.00 |
27 | UNIFORMED POLICE OFFICERS ALLOWANCE | DOLLARS | 100000 | $1.00 | $100,000.00 |
28 | FUEL PRICE ADJUSTMENT | DOLLARS | 10000 | $1.00 | $10,000.00 |
29 | ASPHALT PRICE ADJUSTMENT | DOLLARS | 10000 | $1.00 | $10,000.00 |
30 | VIBRATION MONITORING | LS | 1 | $15,000.00 | $15,000.00 |
31 | CLEARING SITE | LS | 1 | $100,000.00 | $100,000.00 |
32 | EXCAVATION, TEST PIT | CU.YD(S) | 200 | $1.00 | $200.00 |
33 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 6500 | $65.00 | $422,500.00 |
34 | EXCAVATION, REGULATED MATERIAL (IF & WHERE DIRECTED) | CU.YD(S) | 290 | $1.00 | $290.00 |
35 | DISPOSAL OF REGULATED MATERIAL (IF & WHERE DIRECTED) | TON(S) | 405 | $1.00 | $405.00 |
36 | I-14 SOIL AGGREGATE | CU.YD(S) | 890 | $90.00 | $80,100.00 |
37 | GEOTEXTILE, ROADWAY STABILIZATION | SQ.YD(S) | 2300 | $2.00 | $4,600.00 |
38 | SUBBASE | CU.YD(S) | 75 | $115.00 | $8,625.00 |
39 | DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK | SQ.YD(S) | 8500 | $15.00 | $127,500.00 |
40 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 1700 | $18.00 | $30,600.00 |
41 | POLYMERIZED JOINT ADHESIVE | LN.FT | 2650 | $4.00 | $10,600.00 |
42 | TACK COAT | GAL(S) | 1000 | $8.00 | $8,000.00 |
43 | PRIME COAT | GAL(S) | 700 | $14.00 | $9,800.00 |
44 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 500 | $192.00 | $96,000.00 |
45 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 1700 | $126.00 | $214,200.00 |
46 | 15" REINFORCED CONCRETE PIPE | LN.FT | 15 | $500.00 | $7,500.00 |
47 | INLET, TYPE DOUBLE B | UNIT(S) | 2 | $14,000.00 | $28,000.00 |
48 | RENO MATTRESS, 12" THICK | SQ.FT | 4922 | $30.00 | $147,660.00 |
49 | CHAIN-LINK FENCE, PVC-COATED STEEL, 4' HIGH | LN.FT | 300 | $70.00 | $21,000.00 |
50 | CONCRETE SIDEWALK, REINFORCED, 6" THICK | SQ.YD(S) | 102 | $155.00 | $15,810.00 |
51 | HOT MIX ASPHALT DRIVEWAY, 6" THICK | SQ.YD(S) | 130 | $145.00 | $18,850.00 |
52 | BELGIAN BLOCK CURB | LN.FT | 45 | $60.00 | $2,700.00 |
53 | 6"X8"X20" CONCRETE VERTICAL CURB | LN.FT | 225 | $35.00 | $7,875.00 |
54 | NONVEGETATIVE SURFACE, HOT MIX ASPHALT | SQ.YD(S) | 400 | $65.00 | $26,000.00 |
55 | BEAM GUIDE RAIL | LN.FT | 313 | $37.00 | $11,581.00 |
56 | TANGENT GUIDE RAIL TERMINAL | UNIT(S) | 3 | $5,700.00 | $17,100.00 |
57 | CRASH CUSHION, COMPRESSIVE BARRIER, TYPE 3, WIDTH NARROW | UNIT(S) | 1 | $54,000.00 | $54,000.00 |
58 | APPROACH GUIDE RAIL TRANSITION TL-3 | UNIT(S) | 4 | $6,300.00 | $25,200.00 |
59 | TRAFFIC STRIPES, 4" | LN.FT | 18400 | $0.85 | $15,640.00 |
60 | TRAFFIC MARKING LINES, 4" | LN.FT | 4600 | $0.85 | $3,910.00 |
61 | RPM, BI-DIRECTIONAL, AMBER LENS | UNIT(S) | 15 | $132.00 | $1,980.00 |
62 | REMOVAL OF TRAFFIC STRIPES | LN.FT | 18400 | $1.05 | $19,320.00 |
63 | REGULATORY AND WARNING SIGN | SQ.FT | 50 | $45.00 | $2,250.00 |
64 | TEMPORARY GAS MAIN SUPPORT | LS | 1 | $90,000.00 | $90,000.00 |
65 | TOPSOIL SPREADING, 5" THICK | SQ.YD(S) | 3126 | $14.00 | $43,764.00 |
66 | FERTILIZING AND SEEDING, TYPE A-3 | SQ.YD(S) | 3126 | $1.70 | $5,314.20 |
67 | TOPSOIL STABILIZATION, TYPE 3 MAT | SQ.YD(S) | 3126 | $5.75 | $17,974.50 |
68 | STRAW MULCHING | SQ.YD(S) | 3126 | $1.00 | $3,126.00 |
69 | CLEARING SITE, BRIDGE U-33 | LS | 1 | $200,000.00 | $200,000.00 |
70 | I-9 SOIL AGGREGATE | CU.YD(S) | 1512 | $105.00 | $158,760.00 |
71 | COARSE AGGREGATE, SIZE NO. 57 | CU.YD(S) | 143 | $120.00 | $17,160.00 |
72 | TEMPORARY SHEETING | SQ.FT | 16703 | $33.00 | $551,199.00 |
73 | PERMANENT SHEETING | SQ.FT | 1290 | $75.00 | $96,750.00 |
74 | PERMANENT COFFERDAM | LS | 1 | $450,000.00 | $450,000.00 |
75 | FURNISHING EQUIPMENT FOR DRIVING PILES | LS | 1 | $480,000.00 | $480,000.00 |
76 | TEST PILE, FURNISHED | LN.FT | 608 | $60.00 | $36,480.00 |
77 | TEST PILE, DRIVEN | LN.FT | 528 | $130.00 | $68,640.00 |
78 | DYNAMIC PILE LOAD TEST | UNIT(S) | 4 | $3,600.00 | $14,400.00 |
79 | LATERAL PILE LOAD TEST | UNIT(S) | 4 | $8,500.00 | $34,000.00 |
80 | CAST-IN-PLACE CONCRETE PILE, FURNISHED, 12" DIAMETER | LN.FT | 20360 | $65.00 | $1,323,400.00 |
81 | CAST-IN-PLACE CONCRETE PILE, DRIVEN, 12" DIAMETER | LN.FT | 18950 | $30.00 | $568,500.00 |
82 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 73000 | $3.00 | $219,000.00 |
83 | CONCRETE FOOTING | CU.YD(S) | 431 | $1,030.00 | $443,930.00 |
84 | CONCRETE WING WALL | CU.YD(S) | 226 | $2,500.00 | $565,000.00 |
85 | CONCRETE PYLON | LN.FT | 34 | $1,600.00 | $54,400.00 |
86 | CONCRETE BRIDGE HEADWALL | CU.YD(S) | 26 | $3,500.00 | $91,000.00 |
87 | PRECAST CONCRETE CULVERT (3-SIDED FRAME, 18'-6" WIDE X 13'-6" HIGH | LN.FT | 56 | $6,300.00 | $352,800.00 |
88 | NYSDOT 3-BAR BRIDGE RAIL | LN.FT | 135 | $625.00 | $84,375.00 |
89 | RETAINING WALL, LOCATION NO. 1 | SQ.FT | 927 | $220.00 | $203,940.00 |
90 | RETAINING WALL, LOCATION NO. 2 | SQ.FT | 801 | $225.00 | $180,225.00 |
91 | 8" PERFORATED HIGH DENSITY POLYETHYLENE PIPE | LN.FT | 297 | $85.00 | $25,245.00 |
92 | BRONZE PLAQUE | UNIT(S) | 1 | $3,500.00 | $3,500.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering & Traffic Safety
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION @ 732-431-7760
Delivery Date: AS PER SPECIFICATIONS