Number Item Description Unit Qty Unit Price Total
MARBRO, INCORPORATED (Total Awarded: $2,791,117.00)
973-744-8383
1 PROGRESS SCHEDULE LS 1 $2,500.00 $2,500.00
2 PROGRESS SCHEDULE UPDATE UNIT(S) 4 $250.00 $1,000.00
3 MOBILIZATION LS 1 $248,262.05 $248,262.05
4 CONSTRUCTION LAYOUT DOLLAR 35000 $1.00 $35,000.00
5 HEAVY DUTY SILT FENCE, ORANGE LN.FT 740 $6.00 $4,440.00
6 INLET FILTER, TYPE 1 SQ.FT 40 $0.01 $0.40
7 FLOATING TURBIDITY BARRIER, TYPE 2 LN.FT 300 $20.00 $6,000.00
8 DEWATERING BASIN UNIT(S) 1 $2,500.00 $2,500.00
9 SEDIMENT CONTROL BAG SQ.FT 500 $0.01 $5.00
10 CONCRETE WASHOUT SYSTEM LS 1 $2,500.00 $2,500.00
11 OIL ONLY EMERGENCY SPILL KIT, TYPE 1 UNIT(S) 1 $900.00 $900.00
12 EROSION CONTROL SEDIMENT REMOVAL CU.YD(S) 250 $0.01 $2.50
13 BREAKAWAY BARRICADE UNIT(S) 25 $100.00 $2,500.00
14 DRUM UNIT(S) 20 $0.01 $0.20
15 TRAFFIC CONE UNIT(S) 30 $0.01 $0.30
16 CONSTRUCTION SIGNS SQ.FT 340 $14.00 $4,760.00
17 CONSTRUCTION BARRIER CURB LN.FT 140 $15.00 $2,100.00
18 MONMOUTH COUNTY PROJECT SIGN, 6'X4' UNIT(S) 2 $750.00 $1,500.00
19 UNIFORMED POLICE OFFICERS ALLOWANCE DOLLAR 25000 $1.00 $25,000.00
20 FUEL PRICE ADJUSTMENT DOLLAR 1000 $1.00 $1,000.00
21 ASPHALT PRICE ADJUSTMENT DOLLAR 1000 $1.00 $1,000.00
22 CLEARING SITE LS 1 $20,000.00 $20,000.00
23 EXCAVATION, TEST PIT CU.YD(S) 10 $0.01 $0.10
24 EXCAVATION, UNCLASSIFIED CU.YD(S) 1040 $40.00 $41,600.00
25 EXCAVATION, REGULATED MATERIAL ALLOWANCE DOLLAR 6000 $1.00 $6,000.00
26 DISPOSAL OF REGULATED MATERIAL ALLOWANCE DOLLAR 15000 $1.00 $15,000.00
27 I-14 SOIL AGGREGATE CU.YD(S) 1650 $40.00 $66,000.00
28 DENSE-GRADED AGGREGATE BASE COURSE, 6" THICK SQ.YD(S) 2200 $12.00 $26,400.00
29 GEOTEXTILE SQ.YD(S) 2360 $1.00 $2,360.00
30 HMA MILLING, 3" OR LESS SQ.YD(S) 195 $20.00 $3,900.00
31 TACK COAT GAL(S) 145 $0.01 $1.45
32 HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE TON(S) 285 $105.00 $29,925.00
33 HOT MIX ASPHALT 19 M 64 BASE COURSE TON(S) 765 $91.00 $69,615.00
34 15" REINFORCED CONCRETE PIPE LN.FT 12 $110.00 $1,320.00
35 30" REINFORCED CONCRETE PIPE LN.FT 45 $150.00 $6,750.00
36 INLET, TYPE B UNIT(S) 1 $4,500.00 $4,500.00
37 RESET EXISTING CASTING UNIT(S) 1 $500.00 $500.00
38 INLET, TYPE B-2, MODIFIED UNIT(S) 2 $5,000.00 $10,000.00
39 CONCRETE SIDEWALK, 4" THICK SQ.YD(S) 410 $80.00 $32,800.00
40 CONCRETE SIDEWALK, REINFORCED, 6" THICK SQ.YD(S) 18 $90.00 $1,620.00
41 HOT MIX ASPHALT DRIVEWAY, 6" THICK SQ.YD(S) 80 $60.00 $4,800.00
42 CONCRETE DRIVEWAY, REINFORCED, 6" THICK SQ.YD(S) 90 $90.00 $8,100.00
43 6" X 8" X 20" CONCRETE VERTICAL CURB LN.FT 1415 $30.00 $42,450.00
44 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SQ.YD(S) 270 $44.00 $11,880.00
45 BEAM GUIDE RAIL LN.FT 675 $32.00 $21,600.00
46 TANGENT GUIDE RAIL TERMINAL UNIT(S) 2 $4,000.00 $8,000.00
47 CRASH CUSHION, COMPRESSIVE BARRIER, TYPE 2, WIDTH NARROW UNIT(S) 1 $21,000.00 $21,000.00
48 APPROACH GUIDE RAIL TRANSITION TL-2 UNIT(S) 2 $7,500.00 $15,000.00
49 TRAFFIC STRIPES, 4" LN.FT 1450 $1.50 $2,175.00
50 REGULATORY AND WARNING SIGN SQ.FT 10 $40.00 $400.00
51 TOPSOIL SPREADING, 5" THICK SQ.YD(S) 920 $10.00 $9,200.00
52 FERTILIZING AND SEEDING, TYPE A-3 SQ.YD(S) 920 $1.00 $920.00
53 STRAW MULCHING SQ.YD(S) 920 $1.00 $920.00
54 VIBRATION MOVEMENT MONITORING LS 1 $15,000.00 $15,000.00
55 CLEARING SITE, BRIDGE R-27 LS 1 $50,000.00 $50,000.00
56 I-9 SOIL AGGREGATE CU.YD(S) 260 $65.00 $16,900.00
57 COARSE AGGREGATE LAYER CU.YD(S) 45 $31.00 $1,395.00
58 PERMANENT SHEETING SQ.FT 11900 $50.00 $595,000.00
59 TEMPORARY COFFERDAM LS 1 $5,000.00 $5,000.00
60 PERMANENT COFFERDAM LS 1 $50,000.00 $50,000.00
61 FURNISHING EQUIPMENT FOR DRIVING PILES LS 1 $570,000.00 $570,000.00
62 TEST PILE, FURNISHED LN.FT 144 $45.00 $6,480.00
63 TEST PILE, DRIVEN LN.FT 140 $10.00 $1,400.00
64 DYNAMIC LOAD TEST UNIT(S) 2 $2,750.00 $5,500.00
65 CAST-IN-PLACE CONCRETE PILES, FURNISHED, 12" DIAMETER LN.FT 4588 $35.00 $160,580.00
66 CAST-IN-PLACE CONCRETE PILES, DRIVEN, 12" DIAMETER LN.FT 4440 $10.00 $44,400.00
67 REINFORCEMENT STEEL, GALVANIZED LB(S) 13430 $2.50 $33,575.00
68 CONCRETE FOOTING CU.YD(S) 125 $100.00 $12,500.00
69 CONCRETE WINGWALL CU.YD(S) 47 $100.00 $4,700.00
70 CONCRETE PYLON LN.FT 28 $500.00 $14,000.00
71 CONCRETE CAP CU.YD(S) 97 $100.00 $9,700.00
72 PRECAST CONCRETE CULVERT (3-SIDED FRAME, 29'-9" WIDE X 14'-6" HIGH) LN.FT 46 $6,250.00 $287,500.00
73 CONCRETE BRIDGE DECK CU.YD(S) 47 $900.00 $42,300.00
74 CONCRETE BRIDGE SIDEWALK CU.YD(S) 12 $600.00 $7,200.00
75 STEEL 4 BAR BRIDGE RAILING LN.FT 70 $350.00 $24,500.00
76 8" PERFORATED HIGH DENSITY POLYETHYLENE PIPE LN.FT 176 $30.00 $5,280.00
77 BRIDGE IDENTIFICATION PLAQUE UNIT(S) 1 $2,500.00 $2,500.00
  • Posted By:
  • Monmouth County Purchasing
  • Hall of Records, 3rd Floor
  • 1 East Main St.
  • Freehold, NJ 07728
  • Phone: (732) 431-7370
  • Fax: (732) 431-7379
  • On behalf of:
  • Division of Engineering & Traffic Safety
  • Hall of Records Annex
  • 1 East Main Street
  • Freehold, NJ 07728

Contact: ENGINEERING DIVISION 732-431-7760

Delivery Date: AS PER SPECIFICATION