Monmouth County Purchasing Division
F-94-2020
RECONSTRUCTION OF BRIDGE MT-24 ON COUNTY ROUTE 12A (NAVESINK RIVER ROAD) OVER MCCLEES CREEK IN THE TOWNSHIP OF MIDDLETOWN
Awarded:
11/24/2020
Number | Item Description | Unit | Qty | Unit Price | Total |
---|---|---|---|---|---|
J. FLETCHER CREAMER & SON, INC
(Total Awarded: $6,807,471.00)
201-488-9800 |
|||||
1 | PROGRESS SCHEDULE | LS | 1 | $6,000.00 | $6,000.00 |
2 | PROGRESS SCHEDULE UPDATE | UNIT(S) | 3 | $300.00 | $900.00 |
3 | MOBILIZATION | LS | 1 | $269,111.00 | $269,111.00 |
4 | CONSTRUCTION LAYOUT | DOLLAR | 1 | $25,000.00 | $25,000.00 |
5 | HEAVY-DUTY SILT FENCE, ORANGE | LN.FT | 1783 | $7.00 | $12,481.00 |
6 | INLET FILTER, TYPE 1 | SQ.FT | 48 | $38.00 | $1,824.00 |
7 | FLOATING TURBIDITY BARRIER, TYPE 2 | LN.FT | 300 | $33.00 | $9,900.00 |
8 | DEWATERING BASIN | UNIT(S) | 1 | $6,000.00 | $6,000.00 |
9 | SEDIMENT CONTROL BAG | SQ.FT | 500 | $1.00 | $500.00 |
10 | CONCRETE WASHOUT SYSTEM | LS | 1 | $5,000.00 | $5,000.00 |
11 | OIL ONLY EMERGENCY SPILL KIT, TYPE 1 | UNIT(S) | 1 | $500.00 | $500.00 |
12 | EROSION CONTROL SEDIMENT REMOVAL | CU.YD(S) | 10 | $65.00 | $650.00 |
13 | BREAKAWAY BARRICADE | UNIT(S) | 35 | $25.00 | $875.00 |
14 | DRUM | UNIT(S) | 50 | $25.00 | $1,250.00 |
15 | TRAFFIC CONE | UNIT(S) | 50 | $5.00 | $250.00 |
16 | CONSTRUCTION SIGNS | SQ.FT | 1000 | $1.00 | $1,000.00 |
17 | CONSTRUCTION BARRIER CURB | LN.FT | 1900 | $1.00 | $1,900.00 |
18 | PORTABLE VARIABLE MESSAGE SIGN | UNIT(S) | 2 | $8,000.00 | $16,000.00 |
19 | TEMPORARY CRASH CUSHION, INERTIAL BARRIER SYSTEM, 10 MODULES | UNIT(S) | 4 | $2,500.00 | $10,000.00 |
20 | TRAFFIC DIRECTOR, FLAGGER | HOUR(S) | 200 | $88.00 | $17,600.00 |
21 | TRAFFIC MARKING LINES, LATEX , 4" | LN.FT | 4300 | $0.25 | $1,075.00 |
22 | TRAFFIC MARKING LINES, LATEX, 24" | LN.FT | 120 | $3.00 | $360.00 |
23 | UNIFORMED POLICE OFFICERS ALLOWANCE | DOLLAR | 1 | $25,000.00 | $25,000.00 |
24 | MONMOUTH COUNTY PROJECT SIGN, 6'X4' | UNIT(S) | 2 | $1,500.00 | $3,000.00 |
25 | FUEL PRICE ADJUSTMENT | DOLLAR | 1 | $14,750.00 | $14,750.00 |
26 | ASPHALT PRICE ADJUSTMENT | DOLLAR | 1 | $24,000.00 | $24,000.00 |
27 | CLEARING SITE | LS | 1 | $50,000.00 | $50,000.00 |
28 | EXCAVATION, TEST PIT | CU.YD(S) | 4 | $600.00 | $2,400.00 |
29 | EXCAVATION, UNCLASSIFIED | CU.YD(S) | 2010 | $49.00 | $98,490.00 |
30 | EXCAVATION, REGULATED MATERIAL (IF AND WHERE DIRECTED) | CU.YD(S) | 275 | $1.00 | $275.00 |
31 | REMOVAL OF PAVEMENT | SQ.YD(S) | 4120 | $15.00 | $61,800.00 |
32 | DISPOSAL OF REGULATED MATERIAL (IF AND WHERE DIRECTED) | TON(S) | 426 | $1.00 | $426.00 |
33 | I-14 SOIL AGGREGATE | CU.YD(S) | 3000 | $70.00 | $210,000.00 |
34 | DENSE-GRADED AGGREGATE BASE COURSE, 15" THICK | SQ.YD(S) | 5288 | $12.00 | $63,456.00 |
35 | GEOGRID REINFORCEMENT | SQ.YD(S) | 6176 | $4.00 | $24,704.00 |
36 | HMA MILLING, 3" OR LESS | SQ.YD(S) | 375 | $30.00 | $11,250.00 |
37 | TACK COAT | GAL(S) | 273 | $9.00 | $2,457.00 |
38 | HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE | TON(S) | 545 | $120.00 | $65,400.00 |
39 | HOT MIX ASPHALT 19 M 64 BASE COURSE | TON(S) | 1612 | $100.00 | $161,200.00 |
40 | 15" REINFORCED CONCRETE PIPE | LN.FT | 93 | $75.00 | $6,975.00 |
41 | 18" REINFORCED CONCRETE PIPE | LN.FT | 47 | $140.00 | $6,580.00 |
42 | INLET, TYPE B | UNIT(S) | 6 | $4,000.00 | $24,000.00 |
43 | RIPRAP STONE SLOPE PROTECTION, 12" THICK (D50=6") | SQ.YD(S) | 18 | $900.00 | $16,200.00 |
44 | RIPRAP STONE SLOPE PROTECTION, 24" THICK (D50=12") | SQ.YD(S) | 330 | $110.00 | $36,300.00 |
45 | TEMPORARY CHAIN-LINK FENCE, 6' HIGH | LN.FT | 600 | $20.00 | $12,000.00 |
46 | HOT MIX ASPHALT SIDEWALK, 4" THICK | SQ.YD(S) | 1825 | $58.00 | $105,850.00 |
47 | CONCRETE SIDEWALK, REINFORCED, 6" THICK | SQ.YD(S) | 10 | $125.00 | $1,250.00 |
48 | HOT MIX ASPHALT DRIVEWAY, 6" THICK | SQ.YD(S) | 61 | $80.00 | $4,880.00 |
49 | CONCRETE DRIVEWAY, REINFORCED, 6" THICK | SQ.YD(S) | 30 | $125.00 | $3,750.00 |
50 | GRANITE PAVING | SQ.FT | 304 | $35.00 | $10,640.00 |
51 | 6" X 8" X 20" CONCRETE VERTICAL CURB | LN.FT | 2186 | $32.00 | $69,952.00 |
52 | NONVEGETATIVE SURFACE, HOT MIX ASPHALT | SQ.YD(S) | 1107 | $30.00 | $33,210.00 |
53 | BEAM GUIDE RAIL | LN.FT | 1025 | $39.00 | $39,975.00 |
54 | TANGENT GUIDE RAIL TERMINAL | UNIT(S) | 3 | $4,800.00 | $14,400.00 |
55 | CONTROLLED RELEASE TERMINAL | UNIT(S) | 1 | $1,300.00 | $1,300.00 |
56 | CONTROLLED RELEASE TERMINAL ANCHORAGE | UNIT(S) | 1 | $2,000.00 | $2,000.00 |
57 | APPROACH GUIDE RAIL TRANSITION TL-2 | UNIT(S) | 4 | $2,500.00 | $10,000.00 |
58 | TRAFFIC MARKING LINES, 4" | LN.FT | 5300 | $0.70 | $3,710.00 |
59 | RPM, BI-DIRECTIONAL, AMBER LENS | UNIT(S) | 25 | $40.00 | $1,000.00 |
60 | REMOVAL OF TRAFFIC STRIPES | LN.FT | 1000 | $0.60 | $600.00 |
61 | REGULATORY AND WARNING SIGN | SQ.FT | 60 | $55.00 | $3,300.00 |
62 | TEMPORARY TRAFFIC SIGNAL SYSTEM, LOCATION NO. 1 | LS | 1 | $25,000.00 | $25,000.00 |
63 | TEMPORARY TRAFFIC SIGNAL SYSTEM, LOCATION NO. 2 | LS | 1 | $25,000.00 | $25,000.00 |
64 | TOPSOIL SPREADING, 5" THICK | SQ.YD(S) | 2000 | $4.00 | $8,000.00 |
65 | FERTILIZING AND SEEDING, TYPE A-3 | SQ.YD(S) | 2000 | $4.00 | $8,000.00 |
66 | STRAW MULCHING | SQ.YD(S) | 2000 | $2.00 | $4,000.00 |
67 | VIBRATION MOVEMENT MONITORING | LS | 1 | $12,000.00 | $12,000.00 |
68 | CLEARING SITE, BRIDGE MT-24 | LS | 1 | $250,000.00 | $250,000.00 |
69 | I-9 SOIL AGGREGATE | CU.YD(S) | 430 | $55.00 | $23,650.00 |
70 | TEMPORARY SHEETING | SQ.FT | 1260 | $1.00 | $1,260.00 |
71 | PERMANENT SHEETING | SQ.FT | 46210 | $45.00 | $2,079,450.00 |
72 | PERMANENT COFFERDAM | LS | 1 | $350,000.00 | $350,000.00 |
73 | FURNISHING EQUIPMENT FOR DRIVING PILES | LS | 1 | $100,000.00 | $100,000.00 |
74 | TEST PILE, FURNISHED | LN.FT | 420 | $59.00 | $24,780.00 |
75 | TEST PILE, DRIVEN | LN.FT | 400 | $100.00 | $40,000.00 |
76 | DYNAMIC PILE LOAD TEST | UNIT(S) | 4 | $2,500.00 | $10,000.00 |
77 | CAST-IN-PLACE CONCRETE PILE, FURNISHED, 16" DIAMETER | LN.FT | 4010 | $59.00 | $236,590.00 |
78 | CAST-IN-PLACE CONCRETE PILE, DRIVEN, 16" DIAMETER | LN.FT | 3880 | $58.00 | $225,040.00 |
79 | REINFORCEMENT STEEL, GALVANIZED | LB(S) | 58860 | $2.50 | $147,150.00 |
80 | CONCRETE WINGWALL | CU.YD(S) | 47 | $1,300.00 | $61,100.00 |
81 | EPOXY WATERPROOFING | SQ.YD(S) | 80 | $60.00 | $4,800.00 |
82 | CONCRETE CAP | CU.YD(S) | 208 | $2,270.00 | $472,160.00 |
83 | CONCRETE PYLON | LN.FT | 38 | $500.00 | $19,000.00 |
84 | PRESTRESSED CONCRETE BOX BEAM, (TYPE BIII-48), 48"X39" | LN.FT | 1122 | $300.00 | $336,600.00 |
85 | PRECAST CONCRETE ABUTMENT WALL | CU.YD(S) | 63 | $2,200.00 | $138,600.00 |
86 | CONCRETE BRIDGE DECK, HPC | CU.YD(S) | 239 | $940.00 | $224,660.00 |
87 | CONCRETE BRIDGE SIDEWALK | CU.YD(S) | 24 | $1,000.00 | $24,000.00 |
88 | STEEL 4 BAR BRIDGE RAILING | LN.FT | 215 | $325.00 | $69,875.00 |
89 | BRIDGE IDENTIFICATION PLAQUE | UNIT(S) | 1 | $2,500.00 | $2,500.00 |
90 | RETAINING WALL | SQ.FT | 2420 | $25.00 | $60,500.00 |
91 | TEMPORARY STRUCTURE, PEDESTRIAN BRIDGE | LS | 1 | $200,000.00 | $200,000.00 |
92 | 8" PERFORATED HIGH DENSITY POLYETHYLENE PIPE | LN.FT | 130 | $70.00 | $9,100.00 |
- Posted By:
- Monmouth County Purchasing
- Hall of Records, 3rd Floor
- 1 East Main St.
- Freehold, NJ 07728
- Phone: (732) 431-7370
- Fax: (732) 431-7379
- On behalf of:
- Division of Engineering & Traffic Safety
- Hall of Records Annex
- 1 East Main Street
- Freehold, NJ 07728
Contact: ENGINEERING DIVISION 732-431-7760
Delivery Date: AS PER SPECIFICATION